26.03.2013 Views

Wire Rope Hoists _ Operating and Maintenance ... - STAHL-POLSKA

Wire Rope Hoists _ Operating and Maintenance ... - STAHL-POLSKA

Wire Rope Hoists _ Operating and Maintenance ... - STAHL-POLSKA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3 Installation<br />

3.6 Travel limit switch<br />

20<br />

3.6.1 Monorail trolley<br />

The travel limit switches (optional) are mounted on the trolley.<br />

3.6.2 Double rail crab<br />

The travel limit switch assembly is supplied ready-wired but not mounted <strong>and</strong> must<br />

be secured to the towing arm for the power supply.<br />

The switching contacts are designed for control current.<br />

Switching functions:<br />

1. Limit switching in both directions of travel (1 two-way switch, 2 ramps).<br />

2. Pre-switching <strong>and</strong> limit switching in both directions of travel (1 two-way switch, 4<br />

ramps).<br />

The speed is switched over from "fast" to "slow" before the end of the runway is<br />

reached, <strong>and</strong> is cut off at the end of the runway.<br />

X = stop, left<br />

Y = stop, right<br />

Z = fast / slow<br />

Monorail trolley Double rail crab<br />

*1 Switch activator by customer<br />

Type<br />

H C<br />

[mm]<br />

OE-S 04 77 795<br />

OE-S 05 85 915<br />

OE-S 06 87 915<br />

OE-S 07 107 915<br />

09.07<br />

BASH_02_1.FM

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!