26.03.2013 Views

Important Placement Instructions Enclosed See Lifting - Haas ...

Important Placement Instructions Enclosed See Lifting - Haas ...

Important Placement Instructions Enclosed See Lifting - Haas ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Original <strong>Instructions</strong><br />

<strong>Haas</strong> Technical Publications<br />

Installation, Application and Operator’s Manual<br />

Bar Feeder Positioning<br />

1. Lift the left side of the lathe off the leveling pads and position the alignment plate under the two<br />

leveling screws. Lower the lathe and re-level.<br />

Bar Feeder<br />

Leveling<br />

Pad<br />

ST/DS Lathe Alignment Plate<br />

BAR FEEDER<br />

Leveling<br />

Screw<br />

Alignment<br />

Plate<br />

ST-10<br />

25-1026B<br />

DS-30<br />

ST-20/30<br />

25-1576B<br />

25-10195<br />

96-0013, Rev. BB Aug 2012<br />

LATHE<br />

Big Bore, Gearbox, Extended Push<br />

Lathes with Coolant Collector<br />

Extension<br />

Standard Lathes<br />

2. Lift the Bar Feeder with a pallet jack or forklift. Align the right side leveling screws to the<br />

appropriate holes in the alignment plate. Align the leveling pads with the leveling screws and<br />

lower the Bar Feeder onto the pads.<br />

PAgE 13 OF 66

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!