METSI CONSULTANTS: SUMMARY OF MAIN FINDINGS FOR PHASE 1 DEVELOPMENT<br />

LIST OF FIGURES<br />

Figure 3.1 Location of the study rivers and IFR sites 11<br />

Figure 5.1 Broad summary of the likely severity of the biophysical impacts downstream of the<br />

LHWP Phase 1 dams under the Minimum Degradation Scenario. 28<br />

Figure 6.1 Broad summary of the likely severity of the biophysical impacts downstream of the<br />

LHWP Phase 1 dams under the Treaty Scenario 34<br />

Figure 7.1 Broad summary of the likely severity of the biophysical impacts downstream of the<br />

LHWP Phase 1 dams under the Design Limitation Scenario 40<br />

Figure 8.1 Broad summary of the likely severity of the biophysical impacts downstream of the<br />

LHWP Phase 1 dams under the Fourth Scenario 44<br />

Figure 10.1 Comparison of % MAR diverted with the severity of biophysical changes in various<br />

reaches 53<br />

Figure 10.2 Percentage lost of total resource value for each scenario. 57<br />

Figure 13.1 Maintenance total IFR requirements for river condition classes A, B, C and D. 78<br />