07.05.2013 Views

Metsi Consultants - DWA Home Page

Metsi Consultants - DWA Home Page

Metsi Consultants - DWA Home Page

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

7.4. ECONOMIC IMPACTS<br />

Report No 678-F-001<br />

METSI CONSULTANTS: SUMMARY OF MAIN FINDINGS FOR PHASE 1 DEVELOPMENT<br />

The annual resource losses for the predicted reduction in riverine resources and the costs of mitigation of healthrelated<br />

impacts are shown in Table 7.3.<br />

7.5. WATER YIELD<br />

Table 7.3 Annual social losses and costs associated with<br />

the Design Limitation Scenario.<br />

Monetary Value<br />

Cost Type Component<br />

(Maloti)<br />

Resource losses* 1<br />

Mitigation Costs* 3<br />

Fish* 2 1,223,630<br />

Forage 52,617<br />

Medicinal plants 73,442<br />

Wild vegetables 497,030<br />

Trees & shrubs 3,681,018<br />

Sub-Total 5,527,737<br />

Public health 117,584<br />

Animal health 59,340<br />

Sub-Total 176,924<br />

Total 5,704,661<br />

* 1 Based on local trade values<br />

* 2 Total loss assumed for Reach 1 (Matsoku), proportional<br />

losses for other reaches<br />

* 3 Costs of avoiding health impacts<br />

The system yield (using an annual reliability of 98%) associated with the Design Limitation Scenario is estimated<br />

to be 22.8 m 3 s -1 .<br />

41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!