- Page 1 and 2:
CITY OF PINOLE Notice to Contractor
- Page 3 and 4:
Apprentices........................
- Page 5 and 6:
Sewer Rehabilitation Using Cured-in
- Page 7 and 8:
NOTICE INVITING SEALED BIDS CITY OF
- Page 9 and 10:
INSTRUCTIONS TO BIDDERS FORM OF PRO
- Page 11 and 12:
RETURN OF BID SECURITY: The success
- Page 13 and 14:
INTENTIONALLY LEFT BLANK I - 5
- Page 15 and 16:
CONTACT INFORMATION Firm Name: Chec
- Page 17 and 18:
7. If awarded this contract, will y
- Page 19 and 20:
1d. Identify every construction com
- Page 21 and 22:
Licenses 9. List all California con
- Page 23 and 24:
Criminal Matters and Related Civil
- Page 25 and 26:
PART III. COMPLIANCE WITH OCCUPATIO
- Page 27 and 28:
(c) State the number of individuals
- Page 29 and 30:
PART I. ESSENTIAL REQUIREMENTS FOR
- Page 31 and 32:
16. In the last five years, has you
- Page 33 and 34:
PART III. COMPLIANCE WITH OCCUPATIO
- Page 35 and 36:
7. Has there been more than one occ
- Page 37 and 38:
INTENTIONALLY LEFT BLANK PQ - 24
- Page 39 and 40:
5. INSURANCE The Contractor shall a
- Page 41 and 42:
8. PERMITS AND LICENSES The Contrac
- Page 43 and 44:
3. CHARACTER OF WORKERS The Contrac
- Page 45 and 46:
22300. No such substitution shall b
- Page 47 and 48:
The burden of proof as to the compa
- Page 49 and 50:
14. REMOVAL OF INTERFERING OBSTRUCT
- Page 51 and 52:
24. EQUIPMENT REQUIREMENTS The Cont
- Page 53 and 54:
30. REQUEST FOR WORKING DAYS The Co
- Page 55 and 56:
found in Labor Code Section 6500 an
- Page 57 and 58:
5. NOTICE TO PROCEED Upon award of
- Page 59 and 60:
Warning and Protection Devices: The
- Page 61 and 62:
authorized representative. Said wor
- Page 63 and 64:
Store construction water in leakpro
- Page 65 and 66:
If work is permitted after sunset,
- Page 67 and 68:
thoroughly schedule his work and to
- Page 69 and 70:
Payment: Payment for preparation of
- Page 71 and 72: The Contractor shall provide for ac
- Page 73 and 74: materials, or equipment due to the
- Page 75 and 76: The Contractor must provide proof o
- Page 77 and 78: (j) Detailed information describing
- Page 79 and 80: Reference Title ASTM D2990 Test Met
- Page 81 and 82: ASTM F1743 whichever is applicable)
- Page 83 and 84: specifications. All material proper
- Page 85 and 86: smooth. C. INSPECTION The Contracto
- Page 87 and 88: INTENTIONALLY LEFT BLANK PSP-22
- Page 89 and 90: INTENTIONALLY LEFT BLANK
- Page 91 and 92: Legal Business Name: Address: Telep
- Page 93 and 94: INFORMATION REQUIRED OF BIDDER The
- Page 95 and 96: STATEMENT ACKNOWLEDGING PENAL AND C
- Page 97 and 98: Public Contract Code ' 4104 provide
- Page 99 and 100: KNOW ALL PERSONS BY THESE PRESENTS
- Page 101 and 102: NON-COLLUSION AFFIDAVIT TO BE EXECU
- Page 103 and 104: INTENTIALLY LEFT BLANK
- Page 105 and 106: 6. Worker's Compensation Insurance.
- Page 107 and 108: INSURANCE REQUIREMENTS FOR CITY OF
- Page 109 and 110: specifications for the same, shall
- Page 111 and 112: FURTHER, the Surety, for value rece
- Page 113 and 114: AGREEMENT TO COMPLY WITH CALIFORNIA
- Page 115 and 116: Name and address of named insured (
- Page 117 and 118: Name and address of named insured (
- Page 119 and 120: Name and address of named insured (
- Page 121: INTENTIALLY LEFT BLANK C-18