C. INSPECTION<br />
The Contractor shall inspect the CIPP after installation. The inspection will be<br />
performed and recorded using closed circuit television equipment in accordance with<br />
Section 02761. If defects or voids exist, the Contractor shall repair or replace that<br />
section of the pipe at no additional cost to the Owner. Methods of repair shall be<br />
proposed by the Contractor and submitted to the Engineer for review.<br />
3.03 CLEANUP<br />
Following inspection, the Contractor shall clean up the entire project area. The<br />
Contractor shall dispose of all excess material and debris not incorporated into the<br />
permanent installation off-site.<br />
Payment shall be at the contract unit price bid per lineal foot of various size of<br />
Rehabilitated <strong>Sewer</strong> Pipe Using CIPP Method and shall include full compensation for all<br />
labor, materials and incidentals necessary to install the liners and reinstate service laterals<br />
complete and in place and no additional compensation shall be provided.<br />
18. RE-INSTATE SERVICE LATERAL<br />
General: All laterals connected directly to the rehabilitated sewer line shall be reinstated<br />
using methods other than open cut. Laterals shall be reinstated within 6 hours after the<br />
liner installation has been completed. Laterals shall be plugged at their cleanout near the<br />
curb, as needed.<br />
Methods: The methods used to reinstate the laterals shall be submitted to the City and are<br />
subject to the approval of the Resident Engineer. The submittal shall include the<br />
recommendations from the liner manufacture on how to reinstate laterals.<br />
Approval of Lateral Connection: The reinstatement of the lateral connections shall be<br />
subject to approval by the Resident Engineer. The new hole cut in the liner to reinstate<br />
the lateral shall be the same size of the existing lateral connection.<br />
Payment: Full compensation for all work required in this section shall be included in the<br />
prices paid per linear foot <strong>Rehabilitation</strong> Of Sanitary <strong>Sewer</strong> Using CIPP Method and no<br />
additional compensation shall be allowed therefore.<br />
19. SPOT REPAIRS<br />
General: The Contactor shall submit to the Engineer documentation describing the method,<br />
materials, and equipment that will be used in making spot repairs. Bypass pumping shall be used<br />
as specified in these contract documents.<br />
Locations: The City has made preliminary determination where spot repairs will be required<br />
which have been listed in the bid proposal area. Final determination of spot repairs shall be made<br />
as determined by the Contractor and approved by Engineer during the Contractor’s preinstallation<br />
television inspection were obstructions exist in the host pipe that cannot be removed<br />
by standard cleaning methods. The limits of the spot repair shall be determined by the Contractor<br />
and approved by the Engineer.<br />