C. INSPECTION<br />

The Contractor shall inspect the CIPP after installation. The inspection will be<br />

performed and recorded using closed circuit television equipment in accordance with<br />

Section 02761. If defects or voids exist, the Contractor shall repair or replace that<br />

section of the pipe at no additional cost to the Owner. Methods of repair shall be<br />

proposed by the Contractor and submitted to the Engineer for review.<br />

3.03 CLEANUP<br />

Following inspection, the Contractor shall clean up the entire project area. The<br />

Contractor shall dispose of all excess material and debris not incorporated into the<br />

permanent installation off-site.<br />

Payment shall be at the contract unit price bid per lineal foot of various size of<br />

Rehabilitated <strong>Sewer</strong> Pipe Using CIPP Method and shall include full compensation for all<br />

labor, materials and incidentals necessary to install the liners and reinstate service laterals<br />

complete and in place and no additional compensation shall be provided.<br />

18. RE-INSTATE SERVICE LATERAL<br />

General: All laterals connected directly to the rehabilitated sewer line shall be reinstated<br />

using methods other than open cut. Laterals shall be reinstated within 6 hours after the<br />

liner installation has been completed. Laterals shall be plugged at their cleanout near the<br />

curb, as needed.<br />

Methods: The methods used to reinstate the laterals shall be submitted to the City and are<br />

subject to the approval of the Resident Engineer. The submittal shall include the<br />

recommendations from the liner manufacture on how to reinstate laterals.<br />

Approval of Lateral Connection: The reinstatement of the lateral connections shall be<br />

subject to approval by the Resident Engineer. The new hole cut in the liner to reinstate<br />

the lateral shall be the same size of the existing lateral connection.<br />

Payment: Full compensation for all work required in this section shall be included in the<br />

prices paid per linear foot <strong>Rehabilitation</strong> Of Sanitary <strong>Sewer</strong> Using CIPP Method and no<br />

additional compensation shall be allowed therefore.<br />

19. SPOT REPAIRS<br />

General: The Contactor shall submit to the Engineer documentation describing the method,<br />

materials, and equipment that will be used in making spot repairs. Bypass pumping shall be used<br />

as specified in these contract documents.<br />

Locations: The City has made preliminary determination where spot repairs will be required<br />

which have been listed in the bid proposal area. Final determination of spot repairs shall be made<br />

as determined by the Contractor and approved by Engineer during the Contractor’s preinstallation<br />

television inspection were obstructions exist in the host pipe that cannot be removed<br />

by standard cleaning methods. The limits of the spot repair shall be determined by the Contractor<br />

and approved by the Engineer.<br />