- Page 1 and 2: CITY OF PINOLE Notice to Contractor
- Page 3 and 4: Apprentices........................
- Page 5 and 6: Sewer Rehabilitation Using Cured-in
- Page 7 and 8: NOTICE INVITING SEALED BIDS CITY OF
- Page 9 and 10: INSTRUCTIONS TO BIDDERS FORM OF PRO
- Page 11: RETURN OF BID SECURITY: The success
- Page 15 and 16: CONTACT INFORMATION Firm Name: Chec
- Page 17 and 18: 7. If awarded this contract, will y
- Page 19 and 20: 1d. Identify every construction com
- Page 21 and 22: Licenses 9. List all California con
- Page 23 and 24: Criminal Matters and Related Civil
- Page 25 and 26: PART III. COMPLIANCE WITH OCCUPATIO
- Page 27 and 28: (c) State the number of individuals
- Page 29 and 30: PART I. ESSENTIAL REQUIREMENTS FOR
- Page 31 and 32: 16. In the last five years, has you
- Page 33 and 34: PART III. COMPLIANCE WITH OCCUPATIO
- Page 35 and 36: 7. Has there been more than one occ
- Page 37 and 38: INTENTIONALLY LEFT BLANK PQ - 24
- Page 39 and 40: 5. INSURANCE The Contractor shall a
- Page 41 and 42: 8. PERMITS AND LICENSES The Contrac
- Page 43 and 44: 3. CHARACTER OF WORKERS The Contrac
- Page 45 and 46: 22300. No such substitution shall b
- Page 47 and 48: The burden of proof as to the compa
- Page 49 and 50: 14. REMOVAL OF INTERFERING OBSTRUCT
- Page 51 and 52: 24. EQUIPMENT REQUIREMENTS The Cont
- Page 53 and 54: 30. REQUEST FOR WORKING DAYS The Co
- Page 55 and 56: found in Labor Code Section 6500 an
- Page 57 and 58: 5. NOTICE TO PROCEED Upon award of
- Page 59 and 60: Warning and Protection Devices: The
- Page 61 and 62: authorized representative. Said wor
- Page 63 and 64:
Store construction water in leakpro
- Page 65 and 66:
If work is permitted after sunset,
- Page 67 and 68:
thoroughly schedule his work and to
- Page 69 and 70:
Payment: Payment for preparation of
- Page 71 and 72:
The Contractor shall provide for ac
- Page 73 and 74:
materials, or equipment due to the
- Page 75 and 76:
The Contractor must provide proof o
- Page 77 and 78:
(j) Detailed information describing
- Page 79 and 80:
Reference Title ASTM D2990 Test Met
- Page 81 and 82:
ASTM F1743 whichever is applicable)
- Page 83 and 84:
specifications. All material proper
- Page 85 and 86:
smooth. C. INSPECTION The Contracto
- Page 87 and 88:
INTENTIONALLY LEFT BLANK PSP-22
- Page 89 and 90:
INTENTIONALLY LEFT BLANK
- Page 91 and 92:
Legal Business Name: Address: Telep
- Page 93 and 94:
INFORMATION REQUIRED OF BIDDER The
- Page 95 and 96:
STATEMENT ACKNOWLEDGING PENAL AND C
- Page 97 and 98:
Public Contract Code ' 4104 provide
- Page 99 and 100:
KNOW ALL PERSONS BY THESE PRESENTS
- Page 101 and 102:
NON-COLLUSION AFFIDAVIT TO BE EXECU
- Page 103 and 104:
INTENTIALLY LEFT BLANK
- Page 105 and 106:
6. Worker's Compensation Insurance.
- Page 107 and 108:
INSURANCE REQUIREMENTS FOR CITY OF
- Page 109 and 110:
specifications for the same, shall
- Page 111 and 112:
FURTHER, the Surety, for value rece
- Page 113 and 114:
AGREEMENT TO COMPLY WITH CALIFORNIA
- Page 115 and 116:
Name and address of named insured (
- Page 117 and 118:
Name and address of named insured (
- Page 119 and 120:
Name and address of named insured (
- Page 121 and 122:
INTENTIALLY LEFT BLANK C-18