12<br />
3.3 The RPBs consider that <strong>the</strong> m<strong>in</strong>imum hous<strong>in</strong>g <strong>and</strong> employment<br />
figures for 2016 <strong>in</strong> Creat<strong>in</strong>g Susta<strong>in</strong>able Communities could only<br />
be achieved if current transport <strong>in</strong>frastructure plann<strong>in</strong>g<br />
assumptions set out below are delivered as soon as possible<br />
with<strong>in</strong> <strong>the</strong> 2016 timeframe. The successful development of <strong>the</strong><br />
<strong>Gateway</strong> is cont<strong>in</strong>gent upon <strong>the</strong>m.<br />
◆ Channel Tunnel Rail L<strong>in</strong>k <strong>and</strong> CTRL domestic services:<br />
completion 2007<br />
◆ East London Transit phase 1: completion 2008<br />
◆ Greenwich Waterfront transit phase 1: completion 2008<br />
◆ Kent Fastrack: completion <strong>in</strong> phases<br />
◆ M25/A2/A13/A127: Improvements: various completion dates<br />
◆ A249 Swale cross<strong>in</strong>g: completion 2006<br />
◆ DLR extension to City Airport: completion 2005<br />
◆ DLR extension to Woolwich: completion 2008<br />
◆ DLR to Bark<strong>in</strong>g Reach: completion 2008<br />
◆ Thames <strong>Gateway</strong> Bridge: completion 2013<br />
◆ Mayor’s package of bus improvements <strong>in</strong> Transport Strategy<br />
3.4 O<strong>the</strong>r transport projects are needed to reduce <strong>the</strong> serious risk of<br />
under-achievement of <strong>the</strong>se figures <strong>and</strong> to provide <strong>the</strong> potential<br />
for higher figures <strong>and</strong> for substantial cont<strong>in</strong>u<strong>in</strong>g growth. They<br />
<strong>in</strong>clude <strong>the</strong> follow<strong>in</strong>g schemes, which have partial approval, are<br />
<strong>in</strong> preparation or are subject to feasibility studies <strong>and</strong> have <strong>the</strong><br />
potential to be completed before 2016.<br />
◆ Crossrail: phase 1 completion by 2012 <strong>and</strong> development of<br />
phase 2<br />
◆ East London <strong>and</strong> Greenwich Waterfront Transits phase 2:<br />
completion 2010-2012<br />
◆ C2c l<strong>in</strong>e improvements <strong>and</strong> connections<br />
◆ “Transport for Medway”