19.07.2013 Views

Growth and Regeneration in the Gateway - london.gov.uk - Greater ...

Growth and Regeneration in the Gateway - london.gov.uk - Greater ...

Growth and Regeneration in the Gateway - london.gov.uk - Greater ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

20<br />

exp<strong>and</strong> to meet growth as well as deal with relatively high<br />

current levels of educational under-atta<strong>in</strong>ment <strong>in</strong> parts of <strong>the</strong><br />

<strong>Gateway</strong>. There must be vigorous <strong>in</strong>vestment <strong>in</strong> skills’<br />

development. These <strong>in</strong>vestments will be essential for <strong>the</strong><br />

achievement of truly susta<strong>in</strong>able communities.<br />

5.4 Much of <strong>the</strong> cost of provid<strong>in</strong>g <strong>the</strong> necessary <strong>in</strong>frastructure will<br />

fall to <strong>the</strong> private sector, which will ga<strong>in</strong> from <strong>the</strong> enormous<br />

development value generated by <strong>the</strong> sheer scale of growth.<br />

However, some opportunities will be difficult to realize because<br />

of remediation <strong>and</strong> o<strong>the</strong>r preparation costs <strong>and</strong> <strong>the</strong> need for<br />

better access. Substantial public sector resources will <strong>the</strong>refore<br />

be needed to promote development <strong>in</strong> areas that will o<strong>the</strong>rwise<br />

be unattractive for <strong>in</strong>vestors or will be vulnerable to<br />

development at low-density <strong>and</strong> below <strong>the</strong> required quality.<br />

5.5 Environmental improvement is an essential part of <strong>the</strong> <strong>Gateway</strong><br />

strategy. There is a vast range of ecological <strong>and</strong> environmental<br />

assets of <strong>the</strong> highest importance, <strong>in</strong>clud<strong>in</strong>g, of course, <strong>the</strong> River<br />

<strong>and</strong> its environs. Sites of high biodiversity value must be<br />

protected <strong>and</strong>, where appropriate, extended <strong>and</strong> mechanisms<br />

such as Bio-diversity Action Plans used to support this. Good<br />

practice on matters such as energy <strong>and</strong> waste management can<br />

create jobs as well as improve <strong>the</strong> environment. The <strong>gov</strong>ernment<br />

has identified <strong>the</strong> potential of <strong>the</strong> area <strong>in</strong> “Green<strong>in</strong>g <strong>the</strong><br />

<strong>Gateway</strong>” 15 . All <strong>the</strong> regional bodies are develop<strong>in</strong>g green grids<br />

to co-ord<strong>in</strong>ate <strong>and</strong> make best use of open spaces. The Green<br />

Belt should contribute to <strong>the</strong> meet<strong>in</strong>g of <strong>the</strong> needs of<br />

susta<strong>in</strong>able communities through its amenity value for leisure<br />

<strong>and</strong> o<strong>the</strong>r appropriate uses. The capacity of <strong>the</strong> <strong>Gateway</strong> will<br />

only be fully realised if new <strong>in</strong>vestors <strong>and</strong> residents can be<br />

attracted to it <strong>in</strong> very large numbers. This will only happen if <strong>the</strong><br />

image of <strong>the</strong> area improves, <strong>in</strong>clud<strong>in</strong>g under-ground<strong>in</strong>g of<br />

power l<strong>in</strong>es.<br />

5.6 All development will meet required st<strong>and</strong>ards of flood defence.<br />

In practice <strong>the</strong> major areas of development are already protected<br />

to <strong>the</strong> maximum 1:1000 year level. The Environment Agency is<br />

study<strong>in</strong>g flood<strong>in</strong>g issues <strong>in</strong> detail: <strong>the</strong> regional plann<strong>in</strong>g process<br />

will take <strong>in</strong>to account <strong>the</strong> results of this work. Regional plann<strong>in</strong>g<br />

will take <strong>in</strong>to account <strong>the</strong> implications of growth for water,<br />

energy, utilities <strong>and</strong> waste management.<br />

15 Green<strong>in</strong>g <strong>the</strong> <strong>Gateway</strong> ODPM.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!