The Mayor's draft water strategy - london.gov.uk - Greater London ...
The Mayor's draft water strategy - london.gov.uk - Greater London ...
The Mayor's draft water strategy - london.gov.uk - Greater London ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
phase of work will be the construction of the<br />
6.9 kilometre Lee Tunnel from Abbey Mills<br />
to Beckton and the upgrading of Beckton<br />
sewage treatment works. This will deal with<br />
discharges from Abbey Mills that accounts<br />
for up to 50 per cent of discharges from<br />
the CSOs along the Tideway. A planning<br />
application for the Lee Tunnel and extension<br />
of the Beckton sewage treatment works was<br />
submitted in May 2008, with construction<br />
commencing in 2009 and completion by<br />
2014. It is expected to deliver improvements<br />
to the Olympic legacy by eliminating almost<br />
all discharges into the River Lee.<br />
5.9 <strong>The</strong> longer Thames Tunnel from west<br />
<strong>London</strong> to Beckton is more complex than<br />
the Lee Tunnel, requiring more extensive<br />
design work, development effort and<br />
stakeholder engagement. Construction is<br />
Figure 5.2 Proposed Thames Tideway Tunnel<br />
not therefore expected to start until 2012,<br />
with completion in 2020. Improvements<br />
to Beckton sewage treatment works are<br />
necessary to allow rain<strong>water</strong> and sewage that<br />
will drain into the tunnels to be pumped out<br />
and the sewage treated before discharge.<br />
5.10 <strong>The</strong> present scheme was only adopted<br />
after extensive study. <strong>The</strong> Thames Tideway<br />
Strategic Study was set up in 2000 to<br />
assess the environmental impact of the<br />
intermittent discharges on the Thames<br />
Tideway and to identify potential solutions<br />
‘having regard to costs and benefits’.<br />
<strong>The</strong> study reported in 2005 78 , and further<br />
studies were undertaken in 2006. In March<br />
2007 the <strong>gov</strong>ernment announced that it<br />
supported the construction of a full-length<br />
tunnel from Hammersmith to Beckton with<br />
additional spur tunnel from Abbey Mills<br />
73