19.07.2013 Views

The Mayor's draft water strategy - london.gov.uk - Greater London ...

The Mayor's draft water strategy - london.gov.uk - Greater London ...

The Mayor's draft water strategy - london.gov.uk - Greater London ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

phase of work will be the construction of the<br />

6.9 kilometre Lee Tunnel from Abbey Mills<br />

to Beckton and the upgrading of Beckton<br />

sewage treatment works. This will deal with<br />

discharges from Abbey Mills that accounts<br />

for up to 50 per cent of discharges from<br />

the CSOs along the Tideway. A planning<br />

application for the Lee Tunnel and extension<br />

of the Beckton sewage treatment works was<br />

submitted in May 2008, with construction<br />

commencing in 2009 and completion by<br />

2014. It is expected to deliver improvements<br />

to the Olympic legacy by eliminating almost<br />

all discharges into the River Lee.<br />

5.9 <strong>The</strong> longer Thames Tunnel from west<br />

<strong>London</strong> to Beckton is more complex than<br />

the Lee Tunnel, requiring more extensive<br />

design work, development effort and<br />

stakeholder engagement. Construction is<br />

Figure 5.2 Proposed Thames Tideway Tunnel<br />

not therefore expected to start until 2012,<br />

with completion in 2020. Improvements<br />

to Beckton sewage treatment works are<br />

necessary to allow rain<strong>water</strong> and sewage that<br />

will drain into the tunnels to be pumped out<br />

and the sewage treated before discharge.<br />

5.10 <strong>The</strong> present scheme was only adopted<br />

after extensive study. <strong>The</strong> Thames Tideway<br />

Strategic Study was set up in 2000 to<br />

assess the environmental impact of the<br />

intermittent discharges on the Thames<br />

Tideway and to identify potential solutions<br />

‘having regard to costs and benefits’.<br />

<strong>The</strong> study reported in 2005 78 , and further<br />

studies were undertaken in 2006. In March<br />

2007 the <strong>gov</strong>ernment announced that it<br />

supported the construction of a full-length<br />

tunnel from Hammersmith to Beckton with<br />

additional spur tunnel from Abbey Mills<br />

73

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!