23.07.2013 Views

Application for the - City of Sunnyvale - State of California

Application for the - City of Sunnyvale - State of California

Application for the - City of Sunnyvale - State of California

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2012-7450 – St. Anton 1101 N. Fair Oaks Avenue<br />

Recommended Conditions <strong>of</strong> Approval<br />

Page 12 <strong>of</strong> 19 (CC)<br />

incorporated to provide a habitable environment <strong>for</strong> all habitable<br />

space. The building permit plans shall include air condition systems.<br />

WHO: The property owner will be solely responsible <strong>for</strong><br />

implementation and maintenance <strong>of</strong> <strong>the</strong>se mitigation measures.<br />

HOW: The conditions <strong>of</strong> approval will require <strong>the</strong>se mitigation<br />

measures to be incorporated into <strong>the</strong> construction plans. [COA]<br />

[PLANNING] Mitigation Measure<br />

BP-31. CONSTRUCTION EQUIPMENT:<br />

Construction equipment should use noise shielding and muffling<br />

devices. All internal combustion engines used- on <strong>the</strong> sites should be<br />

equipped with adequate muffling devices. All equipment should be in<br />

good mechanical condition, to minimize noise created by faulty or<br />

poorly maintained engine, drive-train and o<strong>the</strong>r components.<br />

Stationary construction, equipment, such as air compressors and<br />

power generators, would be located as far as possible away from<br />

sensitive receptors in <strong>the</strong> site vicinities.<br />

Future contractors should schedule construction activities in shifts to<br />

avoid high noise levels caused by simultaneously operating several<br />

pieces <strong>of</strong> noise-generating equipment. Construction work would be<br />

scheduled in accordance with <strong>City</strong> regulations.<br />

WHO: The property owner will be solely responsible <strong>for</strong><br />

implementation and maintenance <strong>of</strong> <strong>the</strong>se mitigation measures.<br />

HOW: All building permit plans shall indicate this requirement. [COA]<br />

[PLANNING] Mitigation Measure<br />

BP-32. NOISE:<br />

Based on <strong>the</strong> type <strong>of</strong> construction and <strong>the</strong> exterior noise levels,<br />

sound-rated windows are required to achieve <strong>the</strong> interior noise<br />

standard <strong>of</strong> DNL 45 dB. Specifics <strong>of</strong> <strong>the</strong> sound rating <strong>of</strong> windows by<br />

location have been provided in <strong>the</strong> noise consultant’s report. Sound<br />

rated windows <strong>of</strong> high quality would be required <strong>for</strong> all units facing<br />

noise sources as indicated in <strong>the</strong> report.<br />

The applicant shall submit a letter from an acoustical engineer stating<br />

<strong>the</strong> building permit plans are in con<strong>for</strong>mance with <strong>the</strong> report.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!