Application for the - City of Sunnyvale - State of California
Application for the - City of Sunnyvale - State of California
Application for the - City of Sunnyvale - State of California
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2012-7450 – St. Anton 1101 N. Fair Oaks Avenue<br />
Recommended Conditions <strong>of</strong> Approval<br />
Page 12 <strong>of</strong> 19 (CC)<br />
incorporated to provide a habitable environment <strong>for</strong> all habitable<br />
space. The building permit plans shall include air condition systems.<br />
WHO: The property owner will be solely responsible <strong>for</strong><br />
implementation and maintenance <strong>of</strong> <strong>the</strong>se mitigation measures.<br />
HOW: The conditions <strong>of</strong> approval will require <strong>the</strong>se mitigation<br />
measures to be incorporated into <strong>the</strong> construction plans. [COA]<br />
[PLANNING] Mitigation Measure<br />
BP-31. CONSTRUCTION EQUIPMENT:<br />
Construction equipment should use noise shielding and muffling<br />
devices. All internal combustion engines used- on <strong>the</strong> sites should be<br />
equipped with adequate muffling devices. All equipment should be in<br />
good mechanical condition, to minimize noise created by faulty or<br />
poorly maintained engine, drive-train and o<strong>the</strong>r components.<br />
Stationary construction, equipment, such as air compressors and<br />
power generators, would be located as far as possible away from<br />
sensitive receptors in <strong>the</strong> site vicinities.<br />
Future contractors should schedule construction activities in shifts to<br />
avoid high noise levels caused by simultaneously operating several<br />
pieces <strong>of</strong> noise-generating equipment. Construction work would be<br />
scheduled in accordance with <strong>City</strong> regulations.<br />
WHO: The property owner will be solely responsible <strong>for</strong><br />
implementation and maintenance <strong>of</strong> <strong>the</strong>se mitigation measures.<br />
HOW: All building permit plans shall indicate this requirement. [COA]<br />
[PLANNING] Mitigation Measure<br />
BP-32. NOISE:<br />
Based on <strong>the</strong> type <strong>of</strong> construction and <strong>the</strong> exterior noise levels,<br />
sound-rated windows are required to achieve <strong>the</strong> interior noise<br />
standard <strong>of</strong> DNL 45 dB. Specifics <strong>of</strong> <strong>the</strong> sound rating <strong>of</strong> windows by<br />
location have been provided in <strong>the</strong> noise consultant’s report. Sound<br />
rated windows <strong>of</strong> high quality would be required <strong>for</strong> all units facing<br />
noise sources as indicated in <strong>the</strong> report.<br />
The applicant shall submit a letter from an acoustical engineer stating<br />
<strong>the</strong> building permit plans are in con<strong>for</strong>mance with <strong>the</strong> report.