June 1 – 15, 2012 - Office of Planning and Research - State of ...
June 1 – 15, 2012 - Office of Planning and Research - State of ...
June 1 – 15, 2012 - Office of Planning and Research - State of ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>State</strong> Clearinghouse CEQA Database<br />
CEQA Daily Log<br />
Documents Received during the Period: 06/01/<strong>2012</strong> - 06/<strong>15</strong>/<strong>2012</strong><br />
SCH<br />
Number<br />
Title /<br />
Lead Agency /<br />
City--County /<br />
Description<br />
Documents Received on Wednesday, <strong>June</strong> 06, <strong>2012</strong><br />
<strong>2012</strong>032035 320 Church Street, Half Moon Bay, CA 94019<br />
Half Moon Bay, City <strong>of</strong><br />
Half Moon Bay--San Mateo<br />
The proposed project consists <strong>of</strong> a Tentative Subdivision Map, Lot Line<br />
Adjustment, Coastal Development Permit, <strong>and</strong> Use Permit to divide two parcels<br />
totaling 5.5 acres (APNs 056-<strong>15</strong>0-010 <strong>and</strong> 056-<strong>15</strong>0-120) into a small development<br />
with 12 residential lots <strong>and</strong> one commercial lot. The proposed project includes a<br />
private road that will extend from Church Street to direct connection to Highway 1.<br />
An emergency access gate on the private road will separate the proposed<br />
commercial use from local residential traffic. The project also includes various<br />
infrastructure improvements <strong>and</strong> connections including water system<br />
improvements to increase capacity <strong>and</strong> pressure, sewer improvements along<br />
Church Street, l<strong>and</strong>scaping, <strong>and</strong> new fire hydrants.<br />
<strong>2012</strong>032058 Brentwood Capital Improvement Program <strong>2012</strong>/13-2016/17<br />
Brentwood, City <strong>of</strong><br />
Brentwood--Contra Costa<br />
The proposed project is the City's Capital Improvement Program (CIP) budget for<br />
fiscal years <strong>2012</strong>/13-2016/17, which identifies proposed capital improvements <strong>and</strong><br />
preliminary budgets for projects throughout the City over a five-year period.<br />
Capital improvements include a range <strong>of</strong> public works <strong>and</strong> infrastructure projects<br />
to improve the quality <strong>of</strong> life for local residents <strong>and</strong> visitors. Proposed projects<br />
include: roadways, parks <strong>and</strong> trails, water, wastewater, drainage <strong>and</strong> community<br />
facility improvements, plus development-funded improvements throughout the City<br />
<strong>of</strong> Brentwood.<br />
<strong>2012</strong>041041 Whistlestop Levee Repair <strong>and</strong> Public Access Improvement Project<br />
Fish & Game #4<br />
--Monterey<br />
The Whistlestop Levee Repair <strong>and</strong> Public Access Improvement Project (proposed<br />
project) would include two key elements: (1) replacing the existing culverts located<br />
in the Whistlestop levee with an approximately 20-foot long bridge to improve<br />
water quality, fish passage, <strong>and</strong> trail safety for recreational users in the area; <strong>and</strong><br />
(2) relocating the existing dock that extends <strong>of</strong>f the Whistlestop levee to deeper<br />
water to reduce disturbance to mudflat habitat at low tides. The proposed project<br />
would be constructed between July <strong>and</strong> October <strong>2012</strong>.<br />
<strong>2012</strong>069005 Streambed Alteration Agreement 1600-<strong>2012</strong>-022-R2 Taylor THP (2-11-020-PLU)<br />
Fish & Game #2<br />
--Plumas<br />
The California Department <strong>of</strong> Fish <strong>and</strong> Game is executing Lake or Streambed<br />
Alteration Agreement number 1600-<strong>2012</strong>-022-R2, pursuant to Section 1602 <strong>of</strong> the<br />
Fish <strong>and</strong> Game Code to the project applicant, Sierra Pacific Industries. The overall<br />
project for the purposes <strong>of</strong> this agreement shall be limited to the two projects<br />
below. The Permittee shall adhere to all avoidance <strong>and</strong> minimization measures<br />
provided in the timber harvest plan (THP) that may provide more environmental<br />
protections than what is listed in the Agreement. Project 1 (THP Reference Point<br />
#3) Temporary Bridge or Culverts at Taylor Creek: A prefabricated metal bridge or<br />
five or more 6" (or greater) well castings or culverts (modified rock ford). Project 2<br />
(THP Reference Point #5) Rock Ford at Sockum Creek. This crossing shall be<br />
installed at current skid crossing location, <strong>and</strong> shall consist <strong>of</strong> placing 3-6" washed<br />
clean rock along the road for 75 feet on each side <strong>of</strong> the crossing. Rock shall be<br />
installed when crossing is dry. No vegetation shall be removed as part <strong>of</strong> the<br />
project.<br />
Document<br />
Type<br />
NOD<br />
NOD<br />
NOD<br />
NOD<br />
Ending<br />
Date<br />
Page 36