25.08.2013 Views

Installation and Maintenance Instructions - ETO Doors

Installation and Maintenance Instructions - ETO Doors

Installation and Maintenance Instructions - ETO Doors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

I<br />

J<br />

K<br />

step two:<br />

I&J: After checked the aboved<br />

sizes,then install the protection track<br />

I <strong>and</strong> vertical track J accordingly: THE<br />

VERTICAL PROTECTION TRACKS MUST BE<br />

PARRLLEL.In other words,the distance<br />

between the track must be the same at<br />

the top <strong>and</strong> at the bottom. The top of<br />

the vertical tracks must be level as<br />

compared to each other.If possible<br />

please use the gravity dropper to test.<br />

The tops of the vertical tracks must be level with each other.If two vertical<br />

tracks are not level,cut the bottom of one of the tracks or lift the other.<br />

J<br />

I<br />

step three:<br />

K:Align the horizontal trac ks<br />

K with the door header <strong>and</strong><br />

keep exactly the same distance<br />

between the tracks. This<br />

particular point can be<br />

checked by measuring the<br />

diagonals(a=b).<br />

Fasten the curved part of the<br />

horizontal track to the<br />

vertical track J.<br />

b<br />

a<br />

I<br />

K<br />

J<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!