limited capacities and are often dispatched differently from the “powerful” pumped<br />

storage power plants, with the goal of transferr<strong>in</strong>g water (e.g. for irrigation or transfer<br />

purposes), not primarily for stor<strong>in</strong>g excess electricity.<br />

Anticipated contribution of licensed pumped storage power plants<br />

Eight countries <strong>in</strong> EURELECTRIC <strong>Europe</strong> have obta<strong>in</strong>ed licences to build new pumped<br />

storage power plants with a total <strong>in</strong>stalled pump<strong>in</strong>g capacity of 11.6 GW (see Figure<br />

7). 24 Licensed pump<strong>in</strong>g mode capacity and the maximum full-load operation hours of<br />

the new pumped storage power plants <strong>in</strong> these countries are shown <strong>in</strong> Table 1. Blank<br />

cells <strong>in</strong>dicate miss<strong>in</strong>g data.<br />

Country Licensed pump<strong>in</strong>g Maximum time of full<br />

capacity<br />

load operation<br />

Luxembourg 194 MW 6 hours<br />

France 1,100 MW<br />

Austria 1,115 MW 127 hours<br />

UK 1,260 MW<br />

Portugal 1,660 MW 38 hours<br />

Germany 1,700 MW 13 hours<br />

Switzerland 2,140 MW 61 hours<br />

Spa<strong>in</strong> 2,424 MW 52 hours<br />

Total 11,593 MW<br />

Table 1 Total pump capacity and maximum time of full-load operation of licensed pumped storage<br />

power plants<br />

Source: EURELECTRIC 25<br />

Anticipated contribution of pumped storage power plants <strong>in</strong> early plann<strong>in</strong>g stage<br />

Eighteen countries <strong>in</strong> EURELECTRIC <strong>Europe</strong> have new pumped storage facilities <strong>in</strong> an<br />

early plann<strong>in</strong>g stage (no licence yet). The total <strong>in</strong>stalled pump capacity of these plants<br />

is over 19 GW. 26 The total <strong>in</strong>stalled pump capacities for pumped storage power plants<br />

at an early plann<strong>in</strong>g stage are shown per country <strong>in</strong> Table 2. Blank cells <strong>in</strong>dicate<br />

miss<strong>in</strong>g data.<br />

24<br />

EURELECTRIC questionnaire for the assessment of the potential of pumped storage power stations <strong>in</strong> <strong>Europe</strong>; no<br />

data received from Italy<br />

25<br />

ibid. and own research.<br />

26<br />

EURELECTRIC questionnaire for the assessment of the potential of pumped storage power stations <strong>in</strong> <strong>Europe</strong>; no<br />

data received from Italy<br />