the NORDEL system and to connections to other parts of <strong>Europe</strong>. The potential may<br />

also be limited by river regulation restrictions.<br />

CASE STUDY 2 - Offsett<strong>in</strong>g the black-out of 4 November 2006: hydropower’s<br />

contribution<br />

The <strong>in</strong>cident of 4 November 2006 caused electricity supply disruptions to more than 15<br />

million households. The immediate action taken by all TSOs accord<strong>in</strong>g to the UCTE 36<br />

security standards prevented this disturbance from turn<strong>in</strong>g <strong>in</strong>to a <strong>Europe</strong>-wide<br />

blackout.<br />

The cha<strong>in</strong> of events led to occurrence of this disturbance result<strong>in</strong>g <strong>in</strong> <strong>Europe</strong> be<strong>in</strong>g split<br />

<strong>in</strong>to three areas – Western <strong>Europe</strong> (Area 1), North-Eastern <strong>Europe</strong> (Area 2) and South-<br />

Eastern <strong>Europe</strong> (Area 3). The break-up <strong>in</strong>to three systems led to strong disequilibrium<br />

between those areas. Because of the large frequency excursions/fluctuations, a<br />

significant number of generation units (more than 10,000 MW <strong>in</strong> the Western area)<br />

connected to distribution networks were disconnected from the network due to their<br />

protection systems. The <strong>in</strong>vestigations identified that non-fulfilment of the N-1<br />

criterion and <strong>in</strong>sufficient <strong>in</strong>ter-TSO coord<strong>in</strong>ation were the two ma<strong>in</strong> reasons for this<br />

disturbance.<br />

In order to quickly restore balance between electricity generation and consumption,<br />

several steps were <strong>in</strong>itiated, with hydropower (run-of river, hydro with reservoirs and<br />

pumped storage power plants) play<strong>in</strong>g a major role as summarised <strong>in</strong> Figure 14.<br />

Fig. 14 <strong>Hydro</strong>power’s role dur<strong>in</strong>g the <strong>in</strong>cident<br />

Source: UCTE, 2007<br />

Zoom on France and the restart of the system by French EDF hydropower plants<br />

36 From 1 July 2009 onwards ENTSO-E, the <strong>Europe</strong>an Network of Transmission System Operators for Electricity,<br />

took over all operational tasks of the 6 exist<strong>in</strong>g TSO associations <strong>in</strong> <strong>Europe</strong>, <strong>in</strong>clud<strong>in</strong>g UCTE, the Union for the<br />

Coord<strong>in</strong>ation of Transmission of Electricity.<br />

35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!