2.7 STUDY CORRIDORS AND INTERSECTIONS<br />

<strong>Flathead</strong> <strong>County</strong> <strong>Transportation</strong> <strong>Plan</strong> <strong>–</strong> <strong>Phase</strong> <strong>II</strong><br />

This section provides information about the existing conditions of the twelve corridors and sixteen<br />

intersections that were evaluated in detail as part of this <strong>Transportation</strong> <strong>Plan</strong>. Each study intersection<br />

and corridor was analyzed to identify areas where problems currently exist or potentially may exist in<br />

the future. The crash analysis, LOS analysis and capacity levels contained in the previous sections were<br />

also used to help identify potentially deficient areas.<br />

All of the sixteen study intersections and ten of the twelve study corridors evaluated in this Chapter<br />

were also evaluated in the <strong>Flathead</strong> <strong>County</strong> <strong>Transportation</strong> Study ‐ <strong>Phase</strong> 1. Figure 2.9 shows the<br />

location of the study corridors and intersections.<br />

2.7.1 STUDY CORRIDORS<br />

The corridors discussed in this section were evaluated in detail and are shown in Figure 2.9. All other<br />

roads within the study area were not individually evaluated but rather were analyzed as elements of the<br />

transportation system as a whole. These study corridors were chosen based on their importance to the<br />

roadway network, known traffic patterns, accessibility, and community desire. Information collected<br />

along these corridors includes signage, intersection control, surfacing conditions, drainage, sight<br />

distances, crash data, and other factors that may contribute to the performance of the corridor. The<br />

following twelve corridors were evaluated:<br />

1. Ashley Lake Road <strong>–</strong> US Highway 2 to North Ashley Lake Road<br />

2. Church Drive (not evaluated in <strong>Phase</strong> 1) <strong>–</strong> US Highway 93 to Bald Rock Road<br />

3. Columbia Falls Stage / River Road <strong>–</strong> MT Highway 35 to US Highway 2<br />

4. East Reserve Drive <strong>–</strong> US Highway 2 to Helena Flats Road<br />

5. Foothills Road <strong>–</strong> Lake Blaine Road to Echo Lake Road<br />

6. Helena Flats Road <strong>–</strong> MT Highway 35 to East Reserve Drive<br />

7. Hodgson Road <strong>–</strong> US Highway 93 to US Highway 2<br />

8. Holt Stage Road / Mennonite Church Road <strong>–</strong> Steel Bridge Road to Mennonite Church Road<br />

9. Kila Road <strong>–</strong> North intersection with US Highway 2 to south intersection with US Highway 2<br />

10. Lake Blaine Road <strong>–</strong> MT Highway 35 to Hemler Creek Drive<br />

11. Lower Valley Road (not evaluated in <strong>Phase</strong> 1) <strong>–</strong> Willow Glen Drive to MT Highway 82<br />

12. Spring Hill Road <strong>–</strong> Smith Lake Road to its end<br />

Existing <strong>Transportation</strong> System Page | 2‐27