&INDAL HOTIS - CONCUTI<br />

1. Concrete shall be supplied and constructed in accordance with ACI-318<br />

latest edition and shall have a minimum 28-day compressive strength of<br />

2&00 PSI.<br />

2. Water shall not<br />

'the engineer. If<br />

required slump on<br />

adding up to e•<br />

admixtures.<br />

be added to concrete at the jobsite unless approved by<br />

more workability is needed, contractor shall specify<br />

job order. Concrete plant to increase workability by<br />

air entrainment, additional cement, or other approved<br />

3. Calcium chloride or admixtures containing calcium chloride shall not be<br />

used as additives. Where fly ash is used, only type C fly ash shall be<br />

accepted and a maximum of 16• may be substituted for cement.<br />

4. Concrete shall not be placed at temperatures below 40 degrees Fahrei'lhett,<br />

in rainr weather or in other adverse weather conditions.<br />

&. Concrete shall be well consolidated, especially in the vicinity of tendon<br />

anchorages.<br />

6. A 6 mil polyethylene vapor barrier shall be placed under all slabs. All<br />

laps shall be taped.<br />

7. Forms to be stripped no 'less than 24 hours and no more than six days<br />

after placement of concrete.<br />

8. Builder shall verify all dimensions, drops, offsets, brickledges, inserts<br />

and openings with architectural drawings.<br />

GENERAL NOTES - RIINFORCIHO STEEL<br />

1. Reinforcing steel shall be per ASTM grade 60 with deformations per ASTM<br />

A305 and shall be detailed and installed per ACI-318 latest edition.<br />

2. Welded wire fabric shall be 6 x 6 x W2.9 x W2.9 WWF (6 gage) per ASTM<br />

A186. Where shown on the plans, WWF shall be supplied in sheets and<br />

shall be placed two inches below the top of concrete.<br />

3. Where field splices in the continuous reinforcing occur, bars shall be<br />

lapped a distance of 30 times the bar diameter.<br />

4. Where reinforcing steel is shown In the exterior grade beams, provide<br />

corner bars in the outside face to match the horizontal steel from the<br />

Intersecting interior and exterior grade beams.<br />

5. At all re-entrant corners provide 2 14 x 6'-0" In the slab.<br />

B-2