WEEKLY FIELD REPORT -- 552<br />

OJECT:<br />

<strong>ON</strong>-<strong>SITE</strong> <strong>DISPOSAL</strong> FACILITY (OSDF')<br />

LOCATI<strong>ON</strong>:F'ERNALD, OHIO PROJECT NO.:G01341 TASK NO.:M<br />

DESCRIPTI0N:PHASE III & IV C<strong>ON</strong>STRUCTI<strong>ON</strong> WEEK ENDING: 02 JUNE 02<br />

WEEKLY REPORT NO. 249 and 250<br />

The report period covered by Weekly Reports No. 249 and 250 is from Monday, 20 May 2002 through<br />

Sunday, 2 June 2002. The Resident Engineer's Weekly Report and the Construction Quality Control<br />

(CQC) Consultant's Weekly Report are combined into one report for the On-Site Disposal Facility<br />

(OSDF) Phase 111 and Phase IV projects. Weekly reports Nos. 247 and 248 are combined into one<br />

report due to the limited work activities as a result of heavy rains during the period. During the period,<br />

there was approximately 3.3 inches of precipitation recorded.<br />

Construction Prowess<br />

Phase III - Cell 1 Final Cover Construction<br />

Fluor Fernald Construction continued with the repairs to the Cell 1 final cover, including topsoil<br />

placement and seeding, and installation of erosion mat along the access corridors to the final cover<br />

monitoring systems.<br />

Phase 111 - Valve House 0 LTS and Monitoring Well Pipe Installation<br />

No construction activities.<br />

Phase IV - Borrow Area Excavation, Clay Screening and Restoration Activities<br />

Compacted fill material was excavated fiom Sub-Area 1 and placed in Cell 4 and 5 for benches and<br />

floor subgrade.<br />

Phase IV - Impacted Material Placement<br />

Placement of impacted materials continued in Cell 2 and Cell 3 during the report period. Placement of<br />

material types by Cell was as follows.<br />

Cell 2 Cell 3 Weekly Totals<br />

Category 1 664 448 1112<br />

Category 2 64 130 194<br />

Category 3 0 0 0<br />

Category 4 0 0 0<br />

Category 5 0 0 0<br />

Totals 728 578 1306<br />

OOQ262<br />

Y TO: JDC,UAK,WAZ,MWG,KSH,DBG,GKJ,SW,DKPJFB PER:C. Sukow/K. Badu-Tweneboah I<br />

OGeoSyntec Consultants FILE No. 1 -05WFR SHEETNo. 1 of 5