e- GeoSyntec Consultants<br />

w<br />

0;WEEKLY<br />

FIELD REPORT<br />

4552<br />

PROJECT:<br />

<strong>ON</strong>-<strong>SITE</strong> <strong>DISPOSAL</strong> FACILITY (OSDF)<br />

LOCATI<strong>ON</strong>: FERNALD, OHIO PROJECT NO:GQ1029 TASK NO: 04<br />

DESCRIPTI<strong>ON</strong>: PHASE II C<strong>ON</strong>STRUCTI<strong>ON</strong> WEEK ENDING: 28 JANUARY 2001<br />

4<br />

WEEKLY REPORT NO. 180<br />

The report period covered by Weekly Report No. 180 is from Monday, 22 January 200 1<br />

through Sunday, 28 January 2001. The Resident Engineer’s Weekly Report and the<br />

Construction Quality Control (CQC) Consultant’s Weekly Report are combined into one<br />

report for the: (i) On-Site Disposal Facility (OSDF) Phase I1 and Phase I11 projects; and<br />

(ii) Enhanced Permanent Leachate Transmission System (EPLTS) project. During the<br />

period, there was approximately 0.5-in of snow recorded.<br />

Construction Progress<br />

OSDF Phase II<br />

No fieldwork activities.<br />

‘ I<br />

OSDF Phase III<br />

No fieldwork activities. IT Corporation, the Phase 111 Cell 1 Cover Construction<br />

Contractor continued providing submittals for the construction work. Construction is<br />

anticipated to start in Spring 2001.<br />

EPLTS<br />

The STAVER Group, Inc. (STAVER) continued with the installatioderection of the preengineering<br />

buildings. Backfill was placed around Valve House-5 (VH-5) during the<br />

week.<br />

STAVER s subcontractor, RIECK, welded HDPE flanges and installed the plumbing for<br />

the Control Valve House (CVH). RECK also ran a hydrostatic pressure test on the<br />

carbon steel pipes inside the CVH.<br />

STAVER’s subcontractor, B & J Electrical Co., Inc., continued work with the installation<br />

of the electrical line during the week.<br />

000030<br />

1<br />

COPY TO: JDC ,RAH,UAK, WAZ, BAS, MWG ,KSH ,DBG, .<br />

GKJ,MWG,JCJ,TLC,SBW,DKP, JFB<br />

PER C. Sukow/K. Badu-Tweneboah<br />

OGeoSyntec Consultants FILE No. 1-05-WFR SHEETNo. 1 of 3