Kearl Initial Development<br />
The initial development is on schedule for start-up in late 2012<br />
Control<br />
Building<br />
Extraction<br />
Utilities<br />
• Over 65% complete<br />
- Detailed design and<br />
procurement<br />
complete<br />
- Fabrication 85%<br />
- Construction about<br />
50% complete<br />
South Tank Farm<br />
North Tank Farm<br />
Froth Treatment