22.12.2013 Views

Download - Imperial Oil

Download - Imperial Oil

Download - Imperial Oil

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Kearl 345 kbd – Initial Development + Expansion<br />

Design one, build many development plan<br />

kbd<br />

Kearl Development Plan<br />

400<br />

Regulatory Approval @ 345 kbd<br />

300<br />

200<br />

100<br />

0<br />

Expansion<br />

Initial Development<br />

• Reconfigured from 3 phases to Initial<br />

Development and Expansion<br />

• Incorporates Alberta’s Directive 74<br />

issued in 2009 for tailings reclamation<br />

• With 2 phases plus debottlenecking will<br />

achieved approved regulatory capacity<br />

of 345 kbd*<br />

• Different development plan incorporates<br />

new regulation and optimizes full<br />

resource development<br />

– $10.9 billion sanctioned for reconfigured<br />

initial development plan<br />

Full resource development cost remains at ~$5 / bbl<br />

* gross before royalties

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!