outer slope of 1:3 protected with filter mat and armour stone for the scour<br />

protection due to the river flow is planned inside the creek (Figure 2.2).<br />

The containment dike will be used for confining dredge material and interfaced<br />

with property line of the plant neighboring the existing village.<br />

2.2 DREDGING DETAILS<br />

Approach channel: An approach channel of 12.98 kilometres to the berth is<br />

proposed with the minimum depth of 21 m below CD so as to accommodate<br />

berthing of 170,000 DWT vessels. From the preliminary soil investigation, the<br />

dredged materials at this area are supposed to be mainly silty clay due to the fine<br />

sediment deposit. Therefore, it is planned that the whole dredged materials have<br />

to be disposed in deep water having depth beyond 22 m below CD.<br />

Raw material berth: The raw material berthing area between the wharf and the<br />

side edge of the inner channel will be dredged to 20 m below CD to allow berthing<br />

of 170,000 DWT vessels.<br />

Product berth: The product and future berthing area will be dredged to 12 m below<br />

CD to allow berthing of 30,000 DWT vessels whereas water depth for 50,000<br />

DWT vessels should be 13.5 m. To the extent possible, the dredged material will<br />

be used for reclaiming the marshy land required for the port and form a site for the<br />

steel plant.<br />

Dredging volume: Based on the available hydrographic data and considering the<br />

following, the capital dredging volume is estimated and given in Table 2.2.<br />

• Side slope of 1:3 for the approach channels, turning basin and berthing basins<br />

• Vertical tolerance of 0.9 m and horizontal tolerance of 5.5 m in both directions<br />

for channels and basins where 20 m water depth are required<br />

• Vertical tolerance of 0.7 m and horizontal tolerance of 4.7 m in both directions<br />

for channels and basins where 20 m water depth are required<br />