- Page 1 and 2:
Watcr Q!!alit\1 lmprovcmct1t at1()
- Page 3 and 4:
PREFACE/ACKNO\VLEDGMENTS This repor
- Page 5 and 6:
4.5 Solid Wastes . 4.6 Storm Water
- Page 7 and 8:
EXECUTIVE SUMlVlARY Under Contract
- Page 9 and 10:
pretreatment system consists of a h
- Page 11 and 12:
• Increasing the frequency of iro
- Page 13 and 14:
• Non-Contact Cooling Water Elimi
- Page 15 and 16:
Table EX-l - Potential Water Saving
- Page 17 and 18:
1.0 INTRODUCfION TIlis report prese
- Page 19 and 20:
The report is organized into eight
- Page 21 and 22:
2.0 PROCESS OVERVIEW Steel, an iron
- Page 23 and 24:
the mold. As the molten steel cools
- Page 25 and 26:
3.0 AUDIT PROCESS
- Page 27 and 28:
The representatives for the JISICO
- Page 29 and 30:
4.0 AUDIT FINDINGS The findings pre
- Page 31 and 32:
• \Vater Softener Regeneration -
- Page 33 and 34:
This hot scale-containing water is
- Page 35 and 36:
• Iron Oxide Scale from the Conti
- Page 37 and 38:
5.0 POLLUTION PREVENTION AND WASTE
- Page 39 and 40:
While the PP/WM opportunities are i
- Page 41 and 42:
• \Vastewater Treatment Operation
- Page 43 and 44:
6.0 WATER CONSERVATION OPPORTUNITIE
- Page 45 and 46:
system would climinate the cooling
- Page 47 and 48:
7.0 CONCLUSIONS AND RECOMMENDATIONS
- Page 49 and 50:
daily water consumption is due to e
- Page 51 and 52:
The following recommendations addre
- Page 53 and 54:
• Adding coagulant aids or floccu
- Page 55 and 56:
• Installing the closed-loop "rad
- Page 57 and 58:
8.0 FOLLO\V·UP ACTIONS To ensure t
- Page 59 and 60: 8.0 FOLLOW-UP ACTIONS l I \ -:; \ -
- Page 61 and 62: TABLES
- Page 63 and 64: Table 2 - \VAJ \Vastewatcr Discharg
- Page 65 and 66: Table 3 - Sampling Analytical Resul
- Page 67 and 68: Table 5 - Potential Water Savings J
- Page 69 and 70: Iff 11_ \11 FIGURES
- Page 71 and 72: .. Slag-forming ) Material (Iimcsto
- Page 73 and 74: APPENDICES ...
- Page 75 and 76: Eacility Name: '
- Page 77 and 78: WQICP WASTE MINIMIZATION AUDIT r-ac
- Page 79 and 80: WQICP WASTE MINIMIZATION AUDIT Faci
- Page 81 and 82: WQICP WASTE MINIMIZATION AUDIT Faci
- Page 83 and 84: WQICP W1\Sl'£ MINIMIZATION AUDIT F
- Page 85 and 86: ";;QT:CP Facility Name: c1LC;{CO·
- Page 87 and 88: WQICP WASTE MINIMIZATION "AUDIT Fac
- Page 89 and 90: WQICP WASTE MINIMIZATION'AUDIT' Fac
- Page 91 and 92: Facility- Name: WQICP WASTE cD ~{(Q
- Page 93 and 94: ~TE~J:- MAKJNG R!YJ~~Q~ f~RoCES~ __
- Page 96 and 97: MElTSHOP. FROM BILLET STOCKYARD- CO
- Page 98 and 99: ~ , ,...)-. (. ". '. J - • CONCEN
- Page 100 and 101: Wcr I~r IYec...7;u/ct--:' T IIt?n-l
- Page 102 and 103: (j) I et'Y0 -I'ttf1.a~aJ e r--....:
- Page 104 and 105: ) / -----:::::::::::::::===::::::::
- Page 106 and 107: Jordan Iron & Steel Co. by Nfr. \Va
- Page 108 and 109: Water used should be soft water and
- Page 112 and 113: APPENDIXC OVERVIEW OF THE REGULAnON
- Page 114 and 115: guidelines. However, it is a common
- Page 116 and 117: Table. 2a Jordanian Drinking Water
- Page 118 and 119: Table -2c Jordanian Drinking Water
- Page 120 and 121: Table. ,2e Jordanian Drinking Water
- Page 122 and 123: Table. 4 Recommended m:lxlmum conce
- Page 124 and 125: Tavie (, Chloride tolerance of some
- Page 126 and 127: Table ·9 Jh·l:ltivc boron tolcrnn
- Page 128 and 129: Table ·11 LABORATORY DETERMINATION
- Page 130 and 131: T:IIl1e 12 Cnn Ii nu rd Yield polen
- Page 132 and 133: APPENDIXD SITE VISIT PHOTOGRAPHS
- Page 134 and 135: Ii ·WI II mr " 'rTr ',,: ",il11,!,
- Page 138 and 139: Photo 12 - Continuous casting in op
- Page 140 and 141: Photo 15 - Hydraulic shears (in for
- Page 142 and 143: 'r Photo 19 r-Iyclrocycl () ne (t
- Page 144 and 145: APPENDIXE REFERENCES . .-~
- Page 146 and 147: APPENDIXF PPIWM BACKGROUND REPORT
- Page 148 and 149: 1.0 INTRODUCfION 1.1 Background Und
- Page 150 and 151: 2.0 INDUSTRIAL HISTORY 2.1 General
- Page 152 and 153: is fired at one end, the hot combus
- Page 154 and 155: 4.0 WATER USE AND WASTE GENERATION
- Page 156 and 157: 5.0 POLLtITION PREVENTION AND WASTE
- Page 158 and 159: For example, at the Keihin Works in
- Page 160 and 161:
Oil removal - The treatment and rem
- Page 162 and 163:
Allachmcnt A Process Flow Diagram o
- Page 164 and 165:
~ II CA~T STEEL 'HTERWEDIA r - - -
- Page 166 and 167:
Attachment B Iron and Steel Manufac
- Page 168 and 169:
Table B-2 Wa~tewater Standard~ for
- Page 170 and 171:
Table 13-4 Emucnt Standards in Germ