Watcr Q!!alit\1 lmprovcmct1t at1()
- Page 3 and 4:
PREFACE/ACKNO\VLEDGMENTS This repor
- Page 5 and 6:
4.5 Solid Wastes . 4.6 Storm Water
- Page 7 and 8: EXECUTIVE SUMlVlARY Under Contract
- Page 9 and 10: pretreatment system consists of a h
- Page 11 and 12: • Increasing the frequency of iro
- Page 13 and 14: • Non-Contact Cooling Water Elimi
- Page 15 and 16: Table EX-l - Potential Water Saving
- Page 17 and 18: 1.0 INTRODUCfION TIlis report prese
- Page 19 and 20: The report is organized into eight
- Page 21 and 22: 2.0 PROCESS OVERVIEW Steel, an iron
- Page 23 and 24: the mold. As the molten steel cools
- Page 25 and 26: 3.0 AUDIT PROCESS
- Page 27 and 28: The representatives for the JISICO
- Page 29 and 30: 4.0 AUDIT FINDINGS The findings pre
- Page 31 and 32: • \Vater Softener Regeneration -
- Page 33 and 34: This hot scale-containing water is
- Page 35 and 36: • Iron Oxide Scale from the Conti
- Page 37 and 38: 5.0 POLLUTION PREVENTION AND WASTE
- Page 39 and 40: While the PP/WM opportunities are i
- Page 41 and 42: • \Vastewater Treatment Operation
- Page 43 and 44: 6.0 WATER CONSERVATION OPPORTUNITIE
- Page 45 and 46: system would climinate the cooling
- Page 47 and 48: 7.0 CONCLUSIONS AND RECOMMENDATIONS
- Page 49 and 50: daily water consumption is due to e
- Page 51 and 52: The following recommendations addre
- Page 53 and 54: • Adding coagulant aids or floccu
- Page 55 and 56: • Installing the closed-loop "rad
- Page 57: 8.0 FOLLO\V·UP ACTIONS To ensure t
- Page 61 and 62: TABLES
- Page 63 and 64: Table 2 - \VAJ \Vastewatcr Discharg
- Page 65 and 66: Table 3 - Sampling Analytical Resul
- Page 67 and 68: Table 5 - Potential Water Savings J
- Page 69 and 70: Iff 11_ \11 FIGURES
- Page 71 and 72: .. Slag-forming ) Material (Iimcsto
- Page 73 and 74: APPENDICES ...
- Page 75 and 76: Eacility Name: '
- Page 77 and 78: WQICP WASTE MINIMIZATION AUDIT r-ac
- Page 79 and 80: WQICP WASTE MINIMIZATION AUDIT Faci
- Page 81 and 82: WQICP WASTE MINIMIZATION AUDIT Faci
- Page 83 and 84: WQICP W1\Sl'£ MINIMIZATION AUDIT F
- Page 85 and 86: ";;QT:CP Facility Name: c1LC;{CO·
- Page 87 and 88: WQICP WASTE MINIMIZATION "AUDIT Fac
- Page 89 and 90: WQICP WASTE MINIMIZATION'AUDIT' Fac
- Page 91 and 92: Facility- Name: WQICP WASTE cD ~{(Q
- Page 93 and 94: ~TE~J:- MAKJNG R!YJ~~Q~ f~RoCES~ __
- Page 96 and 97: MElTSHOP. FROM BILLET STOCKYARD- CO
- Page 98 and 99: ~ , ,...)-. (. ". '. J - • CONCEN
- Page 100 and 101: Wcr I~r IYec...7;u/ct--:' T IIt?n-l
- Page 102 and 103: (j) I et'Y0 -I'ttf1.a~aJ e r--....:
- Page 104 and 105: ) / -----:::::::::::::::===::::::::
- Page 106 and 107: Jordan Iron & Steel Co. by Nfr. \Va
- Page 108 and 109:
Water used should be soft water and
- Page 111 and 112:
~ d ) 1- 1J ~~ ::; -\.\\'."B ... ,
- Page 113 and 114:
APPLICABLE REGULATORY CRITERIA Curr
- Page 115 and 116:
Table SummJry of requirements of Jo
- Page 117 and 118:
Table 2b Jordanian Drinking \-Vatcr
- Page 119 and 120:
Table 2d Jordanian Drinking Water S
- Page 121 and 122:
Tobie .J Gulddlnes for Inlerprel.li
- Page 123 and 124:
Table 5 Recommended microbiological
- Page 125 and 126:
.., { GUIDLlNES FOI~ INTEI~I'I~ETIN
- Page 127 and 128:
Table 10 'i
- Page 129 and 130:
T:lulc 12 Crop to!crcllcc Jl1d yicl
- Page 131 and 132:
Table 13 Summary of ,"cquircmcnts o
- Page 133 and 134:
Photo 1 - Scrap steel storage Photo
- Page 135:
Photo 5 - Meltshop J.rea Photo 6 -
- Page 139 and 140:
Photo 13 - Pincher rolls Photo 14 -
- Page 141 and 142:
Photo IK - l
- Page 143 and 144:
Photo 21 - Rolling mill WQste\vater
- Page 145 and 146:
REFERENCES Kirk-Othmer Encyclopcdia
- Page 147 and 148:
Tahir of Contents 1.0 INTRODUCTION
- Page 149 and 150:
1.2 OLJjcctivcs The facility PP/WM
- Page 151 and 152:
3.0 PROCESS OVERVIEW In ironmaking,
- Page 153 and 154:
Bar Mill - In the bar mill the bill
- Page 155 and 156:
Steelmaking. The exhaust gas cleani
- Page 157 and 158:
percent for ironrnaking and 96 to 1
- Page 159 and 160:
• Providc separate water systems
- Page 161 and 162:
6.0 REFERENCES Attachment A Attachm
- Page 163 and 164:
COAL ...... BEEHIVE OVENS .- AIR OR
- Page 165 and 166:
l So
- Page 167 and 168:
Tablc B-1 Sclcctcd EPA Effluent Lim
- Page 169 and 170:
Table B-3 National Effluent Standar
- Page 171:
Attachment C Selected Papers on Pol