1.2 OLJjcctivcs<br />

The facility PP/WM audits are designed to assess the potential for pollution prevention and waste minimization<br />

at the study facilities. The goal of each audit is to evaluate and identify all possible PP/WM, wastewater cleanup,<br />

and water conservation teclmiques that are appropriate for the study facility. Audit documentation will<br />

consist of a background PP/WM assessment paper and an audit ev~luation report. This document is intended<br />

to serve as the PPj\VM background paper for the iron and steel manufacturing industry.<br />

The specific objectives of this audit are as follow:<br />

1. Review general industry background data and identify ·state-of-the-art· processing and waste<br />

management practices.<br />

2. Work on-site with industry representatives, ministry officials, and other interested groups to<br />

review current processing procedures and identify possible PP/WM options.<br />

3. Develop a report that evaluates all possible PPfWM alternatives and water conservation<br />

techniques and provides recommendations to the industry.<br />

In order to complete the first objective, a literature review was performed. This review included searches of the<br />

U.S. EPA Pollution Prevention Information Clearinghou.~e(PPIC) repository (and its corresponding database<br />

PIES), on-line library catalog data!J

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!