impact of 4d modeling on construction planning process - Chalmers ...
impact of 4d modeling on construction planning process - Chalmers ...
impact of 4d modeling on construction planning process - Chalmers ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
3.1.1 C<strong>on</strong>structi<strong>on</strong> <strong>planning</strong> aspects by functi<strong>on</strong><br />
As menti<strong>on</strong>ed above, <strong>planning</strong> is a vital and challenging task in c<strong>on</strong>structi<strong>on</strong> project.<br />
The <strong>process</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>planning</strong> is complex and involves a number <str<strong>on</strong>g>of</str<strong>on</strong>g> steps which will be<br />
elucidated in this part. Figure 3-1 briefly illustrates all the functi<strong>on</strong>al steps required<br />
during c<strong>on</strong>structi<strong>on</strong> <strong>planning</strong>.<br />
C<strong>on</strong>structi<strong>on</strong> Planning<br />
Selecting technology and<br />
c<strong>on</strong>structi<strong>on</strong> methods<br />
Identifying work tasks<br />
Coding<br />
Defining activities’<br />
sequences and relati<strong>on</strong><br />
Estimating activity<br />
durati<strong>on</strong>s<br />
Allocating resources<br />
for each activity<br />
Figure 0-3: C<strong>on</strong>structi<strong>on</strong> <strong>planning</strong> aspects by functi<strong>on</strong> (Hendricks<strong>on</strong>, 2000)<br />
The two first functi<strong>on</strong>al steps are to select technology and c<strong>on</strong>structi<strong>on</strong> methods and<br />
to identify work tasks which can be c<strong>on</strong>ducted c<strong>on</strong>currently. Since the selecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
technology and c<strong>on</strong>structi<strong>on</strong> methods can have huge <str<strong>on</strong>g>impact</str<strong>on</strong>g>s <strong>on</strong> the project as a<br />
whole, Hendricks<strong>on</strong> (2000) suggested that planners must cautiously c<strong>on</strong>sider the level<br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> workers’ skills and experience. He also recommended generating a c<strong>on</strong>structi<strong>on</strong><br />
plan based <strong>on</strong> each technology and method in order to assess and compare the benefits<br />
<str<strong>on</strong>g>of</str<strong>on</strong>g> alternative methods for the projects.<br />
Identifying work tasks assist in informing project participants about all the activities<br />
required to complete the projects. These work tasks will then be included in the<br />
8<br />
CHALMERS, Civil and Envir<strong>on</strong>mental Engineering, Master’s Thesis 2012:27