26.12.2013 Views

impact of 4d modeling on construction planning process - Chalmers ...

impact of 4d modeling on construction planning process - Chalmers ...

impact of 4d modeling on construction planning process - Chalmers ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

C<strong>on</strong>tents<br />

1 INTRODUCTION 1<br />

1.1 Background 1<br />

1.2 Problem descripti<strong>on</strong> 2<br />

1.3 Purpose and Research questi<strong>on</strong>s 3<br />

1.4 Thesis structure 4<br />

2 METHODOLOGY 5<br />

2.1 Deductive and inductive theory 5<br />

2.2 Adopted Method 5<br />

3 LITERATURE REVIEW 7<br />

3.1 C<strong>on</strong>structi<strong>on</strong> <strong>planning</strong> 7<br />

3.1.1 C<strong>on</strong>structi<strong>on</strong> <strong>planning</strong> aspects by functi<strong>on</strong> 8<br />

3.1.2 C<strong>on</strong>structi<strong>on</strong> <strong>planning</strong> methods 9<br />

3.2 4D BIM 12<br />

3.2.1 Introducti<strong>on</strong> to BIM 12<br />

3.2.2 Functi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> BIM 13<br />

3.2.3 Dimensi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> BIM 14<br />

3.2.4 4D Planning 16<br />

3.3 Case studies 21<br />

3.3.1 Case study 1 (Kymmell, 2008) 22<br />

3.3.2 Case study 2 (Kymmell, 2008) 24<br />

3.3.3 Case study 3 (Eastman, Teicholz, Sacks, & List<strong>on</strong>, 2011) 25<br />

3.3.4 Case study 4 (Eastman, Teicholz, Sacks, & List<strong>on</strong>, 2011) 26<br />

3.3.5 Case study 5 (Dawood & Sikka, 2008) 28<br />

3.3.6 Case study 6 (Jianping, Yang, Zhenz<strong>on</strong>g, & Ming, 2008) 29<br />

3.3.7 Case study 7 (Dawood & Sikka, 2004) 30<br />

3.3.8 Case study 8 (Mahalingam, Kashyap, & Mahajan, 2010) 32<br />

3.3.9 Case study 9 (J<strong>on</strong>geling & Ol<str<strong>on</strong>g>of</str<strong>on</strong>g>ss<strong>on</strong>, 2007) 35<br />

4 ANALYSIS AND DISCUSSION 37<br />

4.1 Impact <str<strong>on</strong>g>of</str<strong>on</strong>g> 4D <str<strong>on</strong>g>modeling</str<strong>on</strong>g> <strong>on</strong> c<strong>on</strong>structi<strong>on</strong> <strong>planning</strong> over traditi<strong>on</strong>al <strong>planning</strong><br />

methods 37<br />

4.1.1 Benefits <str<strong>on</strong>g>of</str<strong>on</strong>g> 4D <str<strong>on</strong>g>modeling</str<strong>on</strong>g> 37<br />

4.1.2 Shortcomings <str<strong>on</strong>g>of</str<strong>on</strong>g> 4D <str<strong>on</strong>g>modeling</str<strong>on</strong>g> 40<br />

4.2 Maximizing the efficiency <str<strong>on</strong>g>of</str<strong>on</strong>g> 4D <strong>planning</strong> 41<br />

5 CONCLUSION AND RECOMMENDATION 43<br />

5.1 4D <str<strong>on</strong>g>modeling</str<strong>on</strong>g> for c<strong>on</strong>structi<strong>on</strong> <strong>planning</strong> 43<br />

5.2 Recommendati<strong>on</strong>s for further research 44<br />

CHALMERS Civil and Envir<strong>on</strong>mental Engineering, Master’s Thesis 2012:27<br />

III

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!