impact of 4d modeling on construction planning process - Chalmers ...
impact of 4d modeling on construction planning process - Chalmers ...
impact of 4d modeling on construction planning process - Chalmers ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
6 References<br />
Allen, C., & Smallwood, J. (2008). Improving c<strong>on</strong>structi<strong>on</strong> <strong>planning</strong> through 4D <strong>planning</strong>.<br />
Journal <str<strong>on</strong>g>of</str<strong>on</strong>g> Engineering, Design and Technology , 6 (1), 7‐20.<br />
Anderss<strong>on</strong>, N., & Christensen, K. (2007). Retrieved March 07, 2012, from Practical<br />
implicati<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> locati<strong>on</strong>‐based scheduling:<br />
orbit.dtu.dk/getResource?recordId=208573&objectId=1&versi<strong>on</strong>Id=1<br />
Bryman, A. (2004). Social Reseach Methods. Oxford University Press.<br />
BuildingSMART. (2010). C<strong>on</strong>structing the business case: Building informati<strong>on</strong> modelling.<br />
L<strong>on</strong>d<strong>on</strong>: British Standards Instituti<strong>on</strong>.<br />
Chachere, J., Kunz, J., & Levitt, R. (2009). The role <str<strong>on</strong>g>of</str<strong>on</strong>g> reduced latency in Integrated C<strong>on</strong>current<br />
Engineering. Stanford: CIFE.<br />
Dawood, N., & Sikka, S. (2008). tool, Measuring the effectiveness <str<strong>on</strong>g>of</str<strong>on</strong>g> 4D <strong>planning</strong> as a<br />
valuable communicati<strong>on</strong>. ITc<strong>on</strong> , 13, 620‐636.<br />
Dawood, N., & Sikka, S. (2004). Visual 4D <strong>planning</strong> in the UK c<strong>on</strong>structi<strong>on</strong> industry. Retrieved<br />
February 13, 2012, from Digital library <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> informatics:<br />
http://itc.scix.net/data/works/att/bbb3.c<strong>on</strong>tent.02753.pdf<br />
Dixit, V. C. (2007). 4D Modeling: Adding a New Dimensi<strong>on</strong> to CPM Scheduling. AACE<br />
Internati<strong>on</strong>al Transacti<strong>on</strong>s , PS101‐PS108.<br />
Eastman, C., Teicholz, P., Sacks, R., & List<strong>on</strong>, K. (2011). BIM Handbook: A Guide to Building<br />
Informati<strong>on</strong> Modeling for Owners, Managers, Designers, Engineers and C<strong>on</strong>tractors.<br />
Hoboken: John Wiley & S<strong>on</strong>s.<br />
Heesom, D., & Mahdjoubi, L. (2004). Trends <str<strong>on</strong>g>of</str<strong>on</strong>g> 4D CAD applicati<strong>on</strong>s for c<strong>on</strong>structi<strong>on</strong><br />
<strong>planning</strong>. C<strong>on</strong>structi<strong>on</strong> Management and Ec<strong>on</strong>omics , 22, 171–182.<br />
Hendricks<strong>on</strong>, C. (2000). Project Management for C<strong>on</strong>structi<strong>on</strong> ‐ Fundamental C<strong>on</strong>cepts for<br />
Owners, Engineers, Architects and Builders. Retrieved February 27, 2012, from<br />
http://pmbook.ce.cmu.edu/09_C<strong>on</strong>structi<strong>on</strong>_Planning.html<br />
Jianping, Z., Yang, Z., Zhenz<strong>on</strong>g, H., & Ming, L. (2008). C<strong>on</strong>structi<strong>on</strong> Management Utilizing 4D<br />
CAD and Operati<strong>on</strong>s Simulati<strong>on</strong> Methodologies. Tsinghua Science and Technology ,<br />
13 (S1), 241‐247.<br />
J<strong>on</strong>geling, R., & Ol<str<strong>on</strong>g>of</str<strong>on</strong>g>ss<strong>on</strong>, T. (2007). A method for <strong>planning</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> work‐flow by combined use <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
locati<strong>on</strong>‐based scheduling and 4D CAD. Automati<strong>on</strong> in C<strong>on</strong>structi<strong>on</strong> , 16, 189–198.<br />
Koo, B., & Fischer, M. (2000). Feasibility study <str<strong>on</strong>g>of</str<strong>on</strong>g> 4D CAD in commercial. Journal <str<strong>on</strong>g>of</str<strong>on</strong>g><br />
C<strong>on</strong>structi<strong>on</strong> Engineering and Management , 126 (4), 251–260.<br />
CHALMERS, Civil and Envir<strong>on</strong>mental Engineering, Master’s Thesis 2012:27<br />
45