impact of 4d modeling on construction planning process - Chalmers ...
impact of 4d modeling on construction planning process - Chalmers ...
impact of 4d modeling on construction planning process - Chalmers ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
the project, BIM can be used by the building operator to support the operati<strong>on</strong> and<br />
maintenance activities (BuildingSMART, 2010).<br />
Figure 0-7: Functi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> BIM (BuildingSMART, 2010)<br />
3.2.3 Dimensi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> BIM<br />
The availability <str<strong>on</strong>g>of</str<strong>on</strong>g> the informati<strong>on</strong> regarding the project and its c<strong>on</strong>nectedness<br />
characterizes BIM dimensi<strong>on</strong>ally, that is, 3D, 4D and 5D, where 3D is threedimensi<strong>on</strong>al<br />
space; 4D adds time as a dimensi<strong>on</strong>; and 5D includes cost as a dimensi<strong>on</strong><br />
(Kymmell, 2008). An illustrati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> different dimensi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> BIM is represented in<br />
Figure 0-8 below.<br />
14<br />
CHALMERS, Civil and Envir<strong>on</strong>mental Engineering, Master’s Thesis 2012:27