26.12.2013 Views

impact of 4d modeling on construction planning process - Chalmers ...

impact of 4d modeling on construction planning process - Chalmers ...

impact of 4d modeling on construction planning process - Chalmers ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

c<strong>on</strong>structi<strong>on</strong> schedule and be allocated with the resources. Generally, the designati<strong>on</strong><br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> work tasks is developed throughout the <strong>planning</strong> <strong>process</strong> and is finally finished in a<br />

hierarchical framework. Planners need to c<strong>on</strong>sider the project with a holistic point <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

view because neither too detailed nor too simple set <str<strong>on</strong>g>of</str<strong>on</strong>g> activities is beneficial for the<br />

project (Hendricks<strong>on</strong>, 2000).<br />

Once the work tasks have been defined, planners have to decide how l<strong>on</strong>g <str<strong>on</strong>g>of</str<strong>on</strong>g> this<br />

durati<strong>on</strong> is appropriate for the project as well as to put buffer time in case <str<strong>on</strong>g>of</str<strong>on</strong>g> delay. In<br />

most <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> projects, the preferable way <str<strong>on</strong>g>of</str<strong>on</strong>g> scheduling is to base <strong>on</strong> planners’<br />

own experiences and records <str<strong>on</strong>g>of</str<strong>on</strong>g> similar activities from previous projects. Absolutely,<br />

each project is unique and therefore work tasks cannot be identically the same, and<br />

that is when the planners’ <strong>planning</strong> skills are brought into play (Hendricks<strong>on</strong>, 2000).<br />

Al<strong>on</strong>g with scheduling and time estimating, allocating required resources for each<br />

work task is also a crucial step in c<strong>on</strong>structi<strong>on</strong> <strong>planning</strong>. Throughout this step, the<br />

number <str<strong>on</strong>g>of</str<strong>on</strong>g> workers (measured by working hour), the proporti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> materials, the<br />

equipments needed and thereby, the total cost <str<strong>on</strong>g>of</str<strong>on</strong>g> each activity can be defined<br />

(Hendricks<strong>on</strong>, 2000).<br />

Additi<strong>on</strong>ally, since a c<strong>on</strong>structi<strong>on</strong> projects involves thousands <str<strong>on</strong>g>of</str<strong>on</strong>g> activities, using the<br />

full descripti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> each task can make the schedule be intricate and difficult to<br />

comprehend. Using coding system is the favorable method to replaces such lengthy<br />

informati<strong>on</strong> with a neat and c<strong>on</strong>cise system <str<strong>on</strong>g>of</str<strong>on</strong>g> numbers. Additi<strong>on</strong>ally, this coding<br />

system helps improve informati<strong>on</strong> flow, ensure the c<strong>on</strong>sistency <str<strong>on</strong>g>of</str<strong>on</strong>g> various comp<strong>on</strong>ents<br />

in c<strong>on</strong>structi<strong>on</strong> projects and between c<strong>on</strong>structi<strong>on</strong> parties (Hendricks<strong>on</strong>, 2000).<br />

3.1.2 C<strong>on</strong>structi<strong>on</strong> <strong>planning</strong> methods<br />

Throughout the development <str<strong>on</strong>g>of</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> industry, there have been a numerous <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

methods implemented in c<strong>on</strong>structi<strong>on</strong> <strong>planning</strong> such as Gantt chart, critical path<br />

method, linear scheduling and last planner. This part <str<strong>on</strong>g>of</str<strong>on</strong>g> the literature review will<br />

summarize such existing methods, their advantages and disadvantages.<br />

3.1.2.1 Gantt chart<br />

Gantt chart is a time schedule developed by Henry L. Gantt, a predecessor who<br />

initiated applying “scientific management methods” in the industry. Gantt chart exists<br />

as several variants <str<strong>on</strong>g>of</str<strong>on</strong>g> which form and applicati<strong>on</strong> depend <strong>on</strong> scope <str<strong>on</strong>g>of</str<strong>on</strong>g> the projects<br />

CHALMERS, Civil and Envir<strong>on</strong>mental Engineering, Master’s Thesis 2012:27<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!