utilizati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> 4D <str<strong>on</strong>g>modeling</str<strong>on</strong>g>. With the use <str<strong>on</strong>g>of</str<strong>on</strong>g> 4D <str<strong>on</strong>g>modeling</str<strong>on</strong>g>, the sequence <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

activities in the work plan and their <str<strong>on</strong>g>impact</str<strong>on</strong>g> <strong>on</strong> each other can be simulated to check<br />

the authenticity <str<strong>on</strong>g>of</str<strong>on</strong>g> the schedule and to enhance the <strong>planning</strong> <strong>process</strong> to utilize<br />

minimum resources in the c<strong>on</strong>structi<strong>on</strong> phase with maximum benefits and in<br />

minimum time. This leads to cost and time saving like in the large complex project in<br />

case study 4. While Gantt chart is unable to present the relati<strong>on</strong>ship and the <str<strong>on</strong>g>impact</str<strong>on</strong>g><br />

activities have <strong>on</strong> each other.<br />

By using the traditi<strong>on</strong>al methods <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>planning</strong> like Gantt charts and CPM scheduling, it<br />

is very easy to miss some activities in the c<strong>on</strong>structi<strong>on</strong> plan due to lack <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

visualizati<strong>on</strong>. Whereas, 4D <str<strong>on</strong>g>modeling</str<strong>on</strong>g> provide a very effective tool to visualize the<br />

building project and identify all the possible c<strong>on</strong>structi<strong>on</strong> activities leading to an<br />

accurate and detailed work plan. 4D <str<strong>on</strong>g>modeling</str<strong>on</strong>g> also assist the planners in allocating<br />

resources, 4D <str<strong>on</strong>g>modeling</str<strong>on</strong>g> assisted the managers to allocate resources in the Nati<strong>on</strong>al<br />

Stadium for Beijing Olympic as menti<strong>on</strong>ed in case study 6, which is not possible with<br />

CPM scheduling as it presumes that resources are unlimited for c<strong>on</strong>structing the job.<br />

4.1.1.3 Efficient <strong>planning</strong><br />

Efficient c<strong>on</strong>structi<strong>on</strong> <strong>planning</strong> plays an important role in leading the project to its<br />

success. By reviewing the case studies it is quite prominent that 4D <str<strong>on</strong>g>modeling</str<strong>on</strong>g> enables<br />

the planners and project teams to achieve a very effective and efficient <strong>planning</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

c<strong>on</strong>structi<strong>on</strong> works. As observed in case study 1, the field productivity was increased<br />

by 20 to 33% and also the amount <str<strong>on</strong>g>of</str<strong>on</strong>g> rework reduced significantly. There was <strong>on</strong>ly 43<br />

hours <str<strong>on</strong>g>of</str<strong>on</strong>g> rework out <str<strong>on</strong>g>of</str<strong>on</strong>g> 25,000 working hours which is not possible to manage if<br />

traditi<strong>on</strong>al 2D <strong>planning</strong> methods were employed. Similarly, in case study 5, 4D group<br />

restructured the Lego pieces <strong>on</strong>ly 20 times in comparis<strong>on</strong> to 25 times by 2D group<br />

which used 2D drawings and bar chart schedule. The rework was also reduced for the<br />

cultural center project in case study 9 by the implementati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> 4D <strong>planning</strong> and<br />

hence, there were human effort and cost savings. In Beijing Stadium project, the<br />

installati<strong>on</strong> durati<strong>on</strong> was shortened by 16% and in case study 5 as well, the 4D group<br />

managed to achieve 100% project completi<strong>on</strong> as compared to 80% completi<strong>on</strong> by the<br />

2D group within prescribed time implying that productivity has increased due to the<br />

implementati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> 4D <strong>planning</strong>.<br />

Furthermore, the reliability <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>planning</strong> was significantly enhanced by adopting 4D<br />

<str<strong>on</strong>g>modeling</str<strong>on</strong>g> as compare to <strong>planning</strong> by traditi<strong>on</strong>al methods. This reliability degree was<br />

38<br />

CHALMERS, Civil and Envir<strong>on</strong>mental Engineering, Master’s Thesis 2012:27