Skanska Prefabrication Case Study (19 MB) - Hilti Egypt
Skanska Prefabrication Case Study (19 MB) - Hilti Egypt
Skanska Prefabrication Case Study (19 MB) - Hilti Egypt
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Our Motivation:<br />
• Improve quality<br />
• Reduce construction time<br />
• Reduce cost<br />
• Lean out the design and construction process<br />
• Reduce impact on the environment<br />
• Tight urban site with little staging area<br />
• Pushing Building Information Modeling<br />
• Leverage standardization and flexibility<br />
2011 NYC Healthcare Symposium<br />
10/27/2011<br />
14