Temporary Bridge – Performance Metrics<br />

Conventional Delivery<br />

•$2,100,000 to construct<br />

•4-6 months disruption<br />

of entry<br />

Prefabricated Delivery<br />

•$980,000 to construct<br />

•3 days of construction<br />

not disruption<br />

•Overnight removal of<br />

bridge after completion of<br />

permanent connector –<br />

zero disruption to campus<br />

and worksite<br />

2011 NYC Healthcare Symposium<br />

10/27/2011<br />

24