The Business <strong>Case</strong> for <strong>Prefabrication</strong><br />

Earlier Project Delivery<br />

• Reduced Time to First Revenue<br />

• Finance Costs<br />

Lower Construction Costs<br />

• Lower General Conditions<br />

• 4-8% Savings on Prefabricated<br />

Modules<br />

Guaranteed Delivery Through A Predictable Process<br />

2011 NYC Healthcare Symposium<br />

10/27/2011<br />

2