14.02.2014 Views

LFS Cable routing systems - OBO Bettermann

LFS Cable routing systems - OBO Bettermann

LFS Cable routing systems - OBO Bettermann

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Usable cross-section and quantity of cables<br />

A lot of space for a lot of cables<br />

The mono and the duo ducts are<br />

extremely spacious and offer ample<br />

room for line installation. The<br />

trunking depth of 53 mm and the<br />

compact design of the EGS devices<br />

enable the lines to be installed<br />

either above, below or behind the<br />

switches and sockets. The following<br />

tables list the recommended<br />

maximum filling volumes (50%<br />

filling) of the empty and filled Rapid<br />

45 trunking for standard cable<br />

types.<br />

Calculation formula for cable assignment<br />

in the trunking<br />

To calculate the recommended cable<br />

assignment for trunking, you<br />

require the following data:<br />

• Trunking cross-section: D · H<br />

(in mm)<br />

• Realistic space requirements<br />

of the cables: (2r) 2<br />

• Max. filling factor (recommended):<br />

0.5<br />

This data allows calculation of the<br />

usable cross-section for cable assignment,<br />

as follows:<br />

Usable cross-section for cable assignment<br />

= (trunking cross-section<br />

/ (2r) 2 ) · 0.5<br />

Planning aid, device installation trunking, size 45<br />

06 <strong>LFS</strong>_Katalog_2010_Neuer_Stand / en / 25/02/2010 (LLExport_00995)<br />

GEK-K 53100<br />

GEK-A 53100<br />

Without device<br />

installation<br />

With device<br />

installation<br />

Trunking cross-section 4,080 mm² 2,596 mm²<br />

NYM<br />

3 x 1.5 mm<br />

d = 10.5 mm<br />

NYM<br />

5 x 1.5 mm<br />

d = 12 mm<br />

Telecommunications<br />

cable<br />

J-Y(St.)Y 2 x 0.6<br />

d = 5 mm<br />

23 15<br />

18 11<br />

104 66<br />

Filling factor:<br />

0.5 = the capacity<br />

reserve is 50%.<br />

GEK-K 53160<br />

GEK-A 53160<br />

NYM<br />

3 x 1.5 mm<br />

d = 10.5 mm<br />

NYM<br />

5 x 1.5 mm<br />

d = 12 mm<br />

Without device installation<br />

Telecommunications<br />

cable<br />

J-Y(St.)Y 2 x 0.6<br />

d = 5 mm<br />

With device<br />

installation<br />

6,480 mm² 3,696 mm²<br />

36 20<br />

28 15<br />

156 96<br />

Filling factor:<br />

0.5 = the capacity<br />

reserve is 50%.<br />

<strong>LFS</strong><br />

<strong>OBO</strong><br />

37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!