14.02.2014 Views

LFS Cable routing systems - OBO Bettermann

LFS Cable routing systems - OBO Bettermann

LFS Cable routing systems - OBO Bettermann

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Mounting aid, accessories Rapid 80 device installation trunking<br />

Convector panelling, open at bottom<br />

Often, convector panelling is planned in such a<br />

way that it is not connected to the floor, in order<br />

to aid room cleaning.<br />

Convector panelling, closed at bottom<br />

To ensure the continued circulation of the room<br />

air, the connection to the floor should be made<br />

with convection grids.<br />

Panelling with convection grids<br />

Convector panelling can also be fully created<br />

using convection grids. The spaces between<br />

the lamellae supports circulation and creates a<br />

visually attractive solution.<br />

Installation of wall bracket<br />

The fastening holes for wall brackets are drawn<br />

on the wall using a chalk mark. The maximum<br />

panel spacing should be 600 mm.<br />

Installation of stabilising profile<br />

The stabilisation profile is required to install<br />

GEK device installation trunking of trunking<br />

height 213 mm. This is simply locked into the<br />

front of the existing panels.<br />

Installation of wall bracket<br />

The holes for fastening the wall brackets are<br />

drilled and the wall panels fastened to the walls<br />

using bolts and anchors.<br />

Installation of connection profile<br />

When combined with the vertically aligned convection<br />

grids or convector panelling, the appropriate<br />

installation and connection profiles are<br />

locked to the front of the fixing panels.<br />

Installation of wall bracket<br />

The height and depth of the wall panels are<br />

aligned one after the other and then the panels<br />

are locked.<br />

Installation of connection profile<br />

The mounting and connection profiles, type<br />

6VG3/.., are required to install convection grid<br />

profiles, type 6VV3/.. are required for closed<br />

convector panelling.<br />

Planning aid, device installation trunking accessories<br />

06 <strong>LFS</strong>_Katalog_2010_Neuer_Stand / en / 25/02/2010 (LLExport_00995)<br />

Installation of device installation trunking on<br />

wall bracket<br />

The GEK device installation trunking is mounted<br />

on the wall racket and fastened using the<br />

M5 fastening screws. This also creates a conductive<br />

connection between the trunking and<br />

the wall bracket.<br />

Installation of profile connector<br />

The profile connectors for horizontal convection<br />

grids are attached to the wall brackets and<br />

locked with the clamp.<br />

Installation of spacings for convection grid<br />

mounting<br />

When mounting convection grids on the wall<br />

panels, ensure that a maximum spacing of<br />

150 mm is maintained between the end of<br />

the grid lamella and the wall panels.<br />

<strong>LFS</strong><br />

<strong>OBO</strong><br />

55

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!