18.02.2014 Views

PDF document - Faymonville

PDF document - Faymonville

PDF document - Faymonville

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CTE,<br />

OUR ROMANIAN PARTNER<br />

High level of<br />

after sales service<br />

<strong>Faymonville</strong> can now rely on a new partner, the CTE<br />

company. A very sound enterprise with a well-coordinated<br />

sales policy and a very efficient after sales service.<br />

Early 2011, <strong>Faymonville</strong> and CTE decide to enter a<br />

collaboration in order to supply the Romanian market.<br />

Christoph Prümmer, usually responsible for this market,<br />

explains : « CTE was looking for a partnership in the<br />

specialist haulage sector to complete its range of offer.<br />

For <strong>Faymonville</strong> the opportunity was too good to turn down<br />

seeing as CTE already had a showroom, a spare parts<br />

department and the necessary infrastructure required to<br />

represent them. Their technicians have attended a training<br />

course at our premises and Codrut Negrei has been selected<br />

as sales manager for <strong>Faymonville</strong> products. »<br />

CTE distributes the entire range of <strong>Faymonville</strong> products,<br />

with Multimax and Megamax as its leading products.<br />

In August 2011, an event was organised to introduce the new<br />

partner and proceed with the delivery of one 7 axle Multimax<br />

to a major Romanian company. CTE has already sold<br />

something like 30 <strong>Faymonville</strong> vehicles.<br />

CTE has been <strong>Faymonville</strong>'s partner for the Romanian<br />

market for the last year.<br />

INFRASTRUCTURES<br />

The company is going ahead with the<br />

extension of its service workshop.<br />

Yves <strong>Faymonville</strong>, Production Process Manager<br />

tells us more: « A new 600 m 2 annex which<br />

includes a 24 metres sandblasting and metallization<br />

booth as well as a spray booth of the<br />

same length. This workshop will be able to<br />

process products of all brands and allows us<br />

to recondition our client's vehicles. The workshop<br />

will be operational by the end of the<br />

month of May 2012. »<br />

Another development, a logistics centre to be<br />

shared by the Belgian, Luxembourg and<br />

Polish factories. This centre will rely on a<br />

warehousing system christened ‘Shuttle XP’.<br />

Yves <strong>Faymonville</strong> : « The aim is to rationalise<br />

stocking space, improve productivity<br />

even further and optimize restocking.<br />

The system is totally automated for small<br />

items and semi-automated for the rest which<br />

are stocked on pallets. The system is of the<br />

'goods to man' type, that is to say that it<br />

presents the product directly to the operator. »<br />

Software informs the operator of the number<br />

of articles that need to be collected and the<br />

Shuttle organises the collection sequence<br />

reducing the shuttle movements to a minimum.<br />

« This method enables collection times<br />

to be reduced, space and time to be saved,<br />

but also it helps to improve operator<br />

safety », Yves <strong>Faymonville</strong> further underlines.<br />

And there's an<br />

ecological aspect as well<br />

<strong>Faymonville</strong> has also invested in some photovoltaic<br />

panels. The explanation is provided<br />

SERVICE MAX<br />

Effectiveness and ecology<br />

The latest development to date regarding <strong>Faymonville</strong> infrastructures : the expansion of the<br />

painting workshop, a new logistics centre and the installation of a photo-voltaic system.<br />

All of this is going on at Bullange-Bütgenbach (Belgium).<br />

The photo-voltaic installation should<br />

produce the equivalent of 20% of<br />

<strong>Faymonville</strong>'s annual energy<br />

consumption.<br />

THE PHOTO-VOLTAIC<br />

INSTALLATION IN<br />

NUMBERS<br />

• 3 installations producing 250 kWp each<br />

• 1064 panels/installation<br />

• Surface area: 5,219,4 m 2<br />

• Production : 637,602 kWh/year<br />

by Thomas Cypers, head of Certification,<br />

Regulations and Energy : « We're talking<br />

about three installations on three<br />

buildings : <strong>Faymonville</strong> Service, <strong>Faymonville</strong><br />

AG and the CNC Hall. The production<br />

capacity is 750 kWp, which amounts to<br />

20% of our annual consumption. This will<br />

reduce our CO 2 emissions by 182 tons a<br />

year. <strong>Faymonville</strong> will continue investing in<br />

renewable energies, but also in energy<br />

saving, in order to reduce its consumption.<br />

The entire world has now realised that the<br />

cheapest energy is the energy one doesn't<br />

consume… »<br />

P. 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!