Clause<br />
No.<br />
Particulars of <strong>Nepal</strong> <strong>Telecom</strong>’s Requirements<br />
4.2 The proceeds of the Performance Security shall be payable to <strong>Nepal</strong><br />
<strong>Telecom</strong> as compensation for any loss resulting from the Supplier's<br />
failure to complete its obligations under the Contract. <strong>Nepal</strong> <strong>Telecom</strong><br />
can terminate the Contract if the Supplier fails to fulfill the<br />
obligations as per the Contract. Upon termination of the Contract,<br />
the Performance Security submitted under the Contract will be<br />
forfeited and the loss incurred by <strong>Nepal</strong> <strong>Telecom</strong> due to termination<br />
of the Contract shall be borne by the Supplier.<br />
4.3 The Performance Security will be discharged by the <strong>Nepal</strong> <strong>Telecom</strong><br />
not later than thirty (30) days following the date of completion of the<br />
Supplier's performance obligations, including any warranty<br />
obligations, as stated in the Clause No. - 6 "Warranty" of Section IV:<br />
Conditions Of Contract under the contract.<br />
4.4 If the bidder bidding on behalf of the principal company/<br />
manufacturer (other than <strong>Nepal</strong>) shall furnish the performance bond/<br />
guarantee/ security in the currency quoted in the bid price or in US$<br />
from the principal company/ manufacturer.<br />
5 Delivery (*)<br />
5.1 Delivery (by air) of the Goods shall be made by the supplier to <strong>Nepal</strong><br />
<strong>Telecom</strong> MSD store, in several lots as per <strong>Nepal</strong> <strong>Telecom</strong>'s<br />
requirements. The first lot shall be delivered within 45 days from the<br />
date of signing of the Contract. <strong>Nepal</strong> <strong>Telecom</strong> shall provide artwork<br />
and input data within seven (7) days from the date of signing of the<br />
Contract.<br />
Bidder shall state as:<br />
Fully Compliant<br />
/Partially Compliant<br />
/Non Compliant<br />
The remaining lots shall be delivered within 30 days after the receipt of<br />
input data (provided by NT).<br />
The exact numbers of lot and denomination types shall be finalized<br />
at the time of contract negotiation.<br />
<strong>Nepal</strong> <strong>Telecom</strong> shall issue the lot wise Delivery Completion<br />
Certificate (DCC) within thirty (30) days after the receipt of<br />
complete delivery of goods under each lot.<br />
Any delays due to reasons attributable to <strong>Nepal</strong> <strong>Telecom</strong> only shall<br />
be considered.<br />
5.2 Checking<br />
After successful delivery of goods, physical checking will be<br />
performed by the <strong>Nepal</strong> <strong>Telecom</strong>'s checking team within fifteen (15)<br />
days to confirm that the delivered goods meet the technical<br />
specification as per Section VIII: Technical Specifications and meet<br />
the number of quantity as per Section VI: Schedule Of<br />
Requirements.<br />
5.3 The Supplier shall arrange for Pre-Shipment Inspection by the<br />