23.02.2014 Views

Nepal Telecom

Nepal Telecom

Nepal Telecom

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Nepal</strong> <strong>Telecom</strong><br />

<strong>Nepal</strong> Doorsanchar Company Limited<br />

Clause<br />

No.<br />

Particulars of NT’s requirements<br />

Department, <strong>Nepal</strong> <strong>Telecom</strong>. Failure to include this certificate<br />

by the Bidder/Supplier/Manufacturer shall result in the rejection<br />

of the bid.<br />

13.2.5 The manufacturer must have a minimum sales turnover of and<br />

above USD 15 millions for the last three (3) fiscal years which<br />

shall be supported by audited financial statements.<br />

13.2.6 The Bidder/Manufacturer shall submit the certificates from the<br />

Authentic Agency verifying that the offered recharge card paper<br />

is Maxi Gloss (High opacity paper to avoid intense light<br />

penetrates) Paper and weight of the paper is 300 gsm.<br />

Any bid not submitted as per the above sub-clauses of Clause No. –<br />

13 of this section shall be rejected.<br />

14 (*) Visit for proof of compliance during evaluation<br />

NT shall send technical experts to the manufacturer’s premises for the<br />

verification bidder’s claim of compliance to experience and technical<br />

specifications.<br />

The proof of compliance test of the offered recharge cards may be<br />

performed during the Bid evaluation of the tendering process. The Bidder<br />

shall make necessary arrangement with the administration to<br />

accommodate such visit and provide necessary information and access<br />

for evaluation. The bidder shall make arrangements within 15 days of<br />

request letter from NT.<br />

During the proof of compliance test, NT shall conduct tests based on<br />

offered bid and NT’s technical specifications.<br />

The cost of the visits shall be borne by <strong>Nepal</strong> <strong>Telecom</strong> and the duration<br />

shall be of five (5) working days. The Bidder shall arrange for the tests<br />

and other demonstrations as needed and the bidder shall arrange for any<br />

test equipments required and experts to advice and assist in the tests.<br />

The Bidder shall<br />

state as : Fully<br />

Compliant/ Partially<br />

Compliant /Non<br />

Compliant<br />

End of Section VIII: Technical Specification<br />

________________________________________________________________________________________________________<br />

Tender No.: NDCL/MSD-04/066-67 for Supply and Delivery of Recharge Cards for GSM Pre-Paid Service<br />

Page 38 of 40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!