Clause<br />
No.<br />
Particulars of <strong>Nepal</strong> <strong>Telecom</strong>’s Requirements<br />
remedial action as may be necessary, at the Supplier's risk and<br />
expense and without prejudice to any other rights which the <strong>Nepal</strong><br />
<strong>Telecom</strong> may have against the supplier under the Contract.<br />
6.5 During the delivery and testing, if some of the items found missing,<br />
short-supplied or damaged, the Supplier shall supply/ replace these<br />
items without any cost to the <strong>Nepal</strong> <strong>Telecom</strong>, and all the costs<br />
including customs and other local taxes shall be borne by the<br />
Supplier.<br />
7 Payment (*)<br />
100% payment of the foreign currency component for the goods<br />
shall be made through Irrevocable Letter of Credit (L/C) for the<br />
foreign currency component. The L/C for the amount of the Hardware<br />
and Software only will be opened first. The amount for the service<br />
portion will be added afterwards by amending the original L/C.<br />
Bidder shall state as:<br />
Fully Compliant<br />
/Partially Compliant<br />
/Non Compliant<br />
All payment under this contract shall be made only after deduction<br />
of withholding tax (TDS – Tax Deduction at Source) as per the<br />
Income tax law of Government of <strong>Nepal</strong> applicable at the time of the<br />
payment.<br />
Opening of L/C<br />
The <strong>Nepal</strong> <strong>Telecom</strong> shall open irrevocable L/C within fifteen (15)<br />
days from the date of signing the contract, provided error free proforma<br />
invoice has been received within seven (7) days. Delay in<br />
submission of the correct pro-forma invoice may result in delay in<br />
opening of letter of credit which ultimately may delay the<br />
implementation of the system and shall attract liquidated damage.<br />
The Supplier shall provide separate pro-forma invoices for the goods<br />
and services. The breakdown costs of the freight and insurance along<br />
with the costs of goods to be delivered shall be clearly mentioned in<br />
the pro-forma and commercial invoice.<br />
The lot wise Payment of the foreign currency component of the<br />
Goods and Services shall be made in the following manner.<br />
7.1 Payment for goods<br />
7.1a Payment for goods<br />
On Delivery: Eighty (80%) payment of the Price of the goods shall<br />
be made on the issuance of the Delivery Completion Certificate<br />
(DCC) to be issued by <strong>Nepal</strong> <strong>Telecom</strong> for the receipt of all the goods<br />
under the particular lot at Mobile Service Directorate store through<br />
Irrevocable Letter of Credit (L/C) open in favour of the Supplier in a<br />
bank in its country.<br />
7.1b Balance Payment: The remaining twenty (20%) percent of contract<br />