05.03.2014 Views

Lacq Project - Dominique Copin (Total) - IPIECA

Lacq Project - Dominique Copin (Total) - IPIECA

Lacq Project - Dominique Copin (Total) - IPIECA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Objectives of the storage site monitoring<br />

• To monitor the parameters of injection (flow rate, gas composition)<br />

• To follow the well performance and well integrity<br />

• Related to site integrity, to confirm that gas remains confined in the<br />

reservoir,<br />

• no leak upward out of the reservoir through the well and caprock<br />

• no impact to water resources, to biosphere and human health.<br />

• To check that reservoir behaviour is as modelled, to get information to<br />

calibrate tools, to update predictive models.<br />

• Specific geologic configuration of the storage (deep and low<br />

porosity reservoir, gas into gas, final P

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!