03.04.2014 Views

Design, Supply, Transportation, Erection at site, Commissioning

Design, Supply, Transportation, Erection at site, Commissioning

Design, Supply, Transportation, Erection at site, Commissioning

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Page 10 of 34<br />

8. DVD Writer.<br />

9. 320 GB D<strong>at</strong>a-Hard –Disc.<br />

10. Ink-jet Printer.<br />

11. Multi-media Key-Board.<br />

12. Three- button optical mouse.<br />

13. Multi-media speaker.<br />

14. Oper<strong>at</strong>ing system- Windows XP processor with licenses.<br />

15. MS Office-2010 Antivirus with license.<br />

Incase of non-availability of specific brand of the above the firm shall take permission<br />

from the competent authority for the brand being purchased.<br />

DETAIL DESIGN DATA FOR E.T.P.<br />

1. Capacity :<br />

The capacity of Effluent Tre<strong>at</strong>ment Plant is 12.50 KLH (Average flow). The peak<br />

factor for the design purpose is to be taken as 1.5.<br />

2. Effluent characteristics (given by tendrer in previous offers)<br />

N<strong>at</strong>ure of Waste<br />

: Industrial effluent<br />

C.O.D. (Max.) : 1200<br />

B.O.D. (Max.)<br />

: 800 mg/l<br />

S.S.<br />

: 4000 mg/l<br />

T.D.S.<br />

: 6800 mg/l<br />

Oil & Grease<br />

: 5000 mg/l<br />

Av. <strong>Design</strong> flow r<strong>at</strong>e : 12.50 KLH<br />

Peak flow factor : 1.5<br />

Feed<br />

: Pumped to inlet-port of Oil-W<strong>at</strong>er Separ<strong>at</strong>or.<br />

3. Tre<strong>at</strong>ed W<strong>at</strong>er Standard :<br />

FINAL EFFULENT QUALITY SHOULD BE CONFORMING TO THE LATEST(AS<br />

ON DATE OF NOTIFICATION OF TENDER) NORMS OF UPPCB/CPCB.<br />

B.O.D. (Max.)<br />

: 30 mg/l<br />

C.O.D. (Max.)<br />

: 250 mg/l<br />

S.S.<br />

: 100 mg/l<br />

T.D.S.<br />

: 2100 mg/l<br />

Oil & Grease<br />

: 10 mg/l<br />

MECHANICAL & ELECTRICAL WORKS<br />

1. Fully Autom<strong>at</strong>ic Oil-W<strong>at</strong>er Separ<strong>at</strong>or<br />

No. of Unit : 1<br />

Type<br />

: Fully autom<strong>at</strong>ic in Cylindrical shape<br />

MOC of Shell<br />

: MS as per IS 2062, Sand blasted and epoxy painted<br />

Oil-W<strong>at</strong>er Interface Sensor : To be Provided.<br />

Electro-Pneum<strong>at</strong>ic Valve : to be Provided.<br />

Capacity<br />

: 12.50 KLH<br />

2. DAF Unit<br />

No. of Required<br />

: 01 Set<br />

Type<br />

: Rectangular with hopper bottom.<br />

MOC<br />

: Mild steel epoxy painted.<br />

Skid<br />

: Provided.<br />

S<strong>at</strong>ur<strong>at</strong>ion Tank<br />

: Provide.<br />

Pressure Gauge<br />

: Provided.<br />

Pressure relief valve : provided.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!