Verific<strong>at</strong>ion of antecedents of the personnel :<br />

Page 28 of 34<br />

The contractor should engage the labour whose character and antecedents have been<br />

verified before they are utilized to work in Railway in the event of any staff of the contractor<br />

being found indulging in external activities, the contractor shall be liable for the same and<br />

further if the Railway administr<strong>at</strong>ion on inquiry comes to know th<strong>at</strong> proper verific<strong>at</strong>ion of the<br />

antecedents was not carried out by the contractor in case of the labour employed by him, this<br />

contract will be liable to be termin<strong>at</strong>ed forth with.<br />

Acceptance of additional conditions proposed by the tenderer :<br />

Any condition of the tender other than those stipul<strong>at</strong>ed in the documents are not<br />

applicable even through they are included in the tender submitted by the party unless they are<br />

specifically accepted by the Railway in writing while communic<strong>at</strong>ing the acceptance of the<br />

tender. The successful tenderer should therefore ensure th<strong>at</strong> the Railway before accepting the<br />

offer should accept such conditions th<strong>at</strong> are considered necessary by him. This acceptance<br />

must be obtained in written form<strong>at</strong>.<br />

Vari<strong>at</strong>ion of scope of work :<br />

Changes in scope of work will be done after mutual consider<strong>at</strong>ion and agreement.<br />

Changes in scope of work under normal circumstances shall not exceed 25% of a total value of<br />

contract. Changes in excess of scope of work exceeding 25% of a total cost will be dealt<br />

separ<strong>at</strong>ely from this contract.<br />

Modific<strong>at</strong>ion of contract :<br />

Sr. Divisional Mechanical Engineer (Diesel)/N.E. Railway, Gonda reserves the rights to<br />

reject/accept the whole or part of the offer or for the portion of the quantity indic<strong>at</strong>ed in the<br />

offer without assigning any reason there upon and the right to open the negoti<strong>at</strong>ion and to call<br />

for the revised offer, or to alter or to modify and of conditions or to incorpor<strong>at</strong>e any new<br />

conditions as found necessary till the contract is finally executed. All decisions and behalf of<br />

the Railway administr<strong>at</strong>ion will be taken up by Sr. Divisional Mechanical Engineer<br />

(Diesel)/N.E. Railway, Gonda and shall be final and binding on the contractor.<br />

M<strong>at</strong>ter finally decided by the Railway ;<br />

All dispute and differences of any kind wh<strong>at</strong> so ever arising out of or in connection<br />

with the contract whether during the progress of the works or after the completion and whether<br />

before or after determin<strong>at</strong>ion of the contract shall be decided by the Sr. Divisional Mechanical<br />

Engineer (Diesel)/N.E. Railway, Gonda.<br />

The decision, direction & certific<strong>at</strong>e with respect to any m<strong>at</strong>ters, the decision of which<br />

is specifically provided of by these or other special condition, given and made by Sr.<br />

Divisional Mechanical Engineer (Diesel)/N.E. Railway, Gonda be referred herein after as<br />

“Excepted m<strong>at</strong>ter” and shall be final and binding upon the contractor and shall not be set aside<br />

on any account of any informality or omission delay or error in proceeding in or about the<br />

same or any other ground or for any other reason.<br />

Arbitr<strong>at</strong>ion :<br />

Any dispute arising between the parties of contract shall be settled through arbitr<strong>at</strong>ion<br />

as per arbitr<strong>at</strong>ion clause 62, 63 & 64 of the GCC 1999. The provision of GCC arbitr<strong>at</strong>ion &<br />

concili<strong>at</strong>ion act 1996 shall be applicable.<br />

Termin<strong>at</strong>ion of the contract :<br />

The Sr. Divisional Mechanical Engineer (Diesel)/N.E. Railway, Gonda or his<br />

authorized represent<strong>at</strong>ive reserves the right to termin<strong>at</strong>e the contract <strong>at</strong> any stage without<br />

assigning any reason wh<strong>at</strong>soever after serving one month’s notice to the contractor.