Page 16 of 34<br />

5. Provision for oil collection in 210 Ltrs. barrel<br />

The effluent tre<strong>at</strong>ment system will separ<strong>at</strong>e w<strong>at</strong>er oil /grease etc. through the OWS.<br />

The provision of mechanized collecting of this oil in 210 ltr barrel with minimum manual<br />

labour should be arranged. However empty 210 ltr barrels will be provided free of cost for<br />

collecting oil and oil should be handed over to SSE/Gen for further disposal.<br />

NOTE :- All by products from the plants must be non polluting and should be acceptable<br />

by the UPPCB/Lucknow.(AS PER LATEST NORMS)<br />

6. <strong>Commissioning</strong> and approval / certific<strong>at</strong>ion of the effluent tre<strong>at</strong>ment system<br />

6.1 Once the consent to oper<strong>at</strong>e the plant received from U.P. Pollution Control Board<br />

(UPPCB) and the plant has been handed over to Sr. DME/DSL/Gonda and the acceptance<br />

tests have been completed successfully. The plant shall be tre<strong>at</strong>ed as commissioned. The<br />

charges for obtaining consent to oper<strong>at</strong>e the plant from UPPCB will have to be borne the<br />

tenderer.<br />

6.2 The effluent tre<strong>at</strong>ment plant after commissioning will be run by the firm a period of six<br />

months. During this period tre<strong>at</strong>ed effluent samples will be sent to Uttar Pradesh<br />

Pollution Control Board or their approved lab for testing <strong>at</strong> an interval of 15 days. The<br />

charges for these tests will have to be borne by the tenderer. The results given by the<br />

Uttar Pradesh Pollution Control Board will be scrutinized and only after s<strong>at</strong>isfactory<br />

results obtained as per Uttar Pradesh Pollution Control Boards general standard for<br />

discharged pollutants (Into inland surface w<strong>at</strong>er) in consonance to EPA-86, the plant will<br />

be tre<strong>at</strong>ed finally commissioned.<br />

6.3 The tenderer should carefully read all the conditions about the n<strong>at</strong>ure of work involved as<br />

per technical specific<strong>at</strong>ion and schedule of work. The tenderer must give detailed<br />

brochures on the items offered by them including technical details etc.<br />

6.4 In case of devi<strong>at</strong>ions from the specified schedules merits of the items offered by them<br />

over the specified schedules should be worked out and submitted along with the offer.<br />

6.5 The work shall be completed with in 120 days from the d<strong>at</strong>e of communic<strong>at</strong>ion of<br />

acceptance of tender. However the tenderers must quote the delivery schedules.<br />

6.6 The firm will supply all consumables and provide necessary manpower etc. to run the<br />

plant during these periods. Electrical charges will be borne by the Railway.<br />

7. Penalty for delay in commissioning:<br />

The contractor or his agent shall commission the Effluent tre<strong>at</strong>ment plant with in the<br />

stipul<strong>at</strong>ed time as shown in the contract. This time frame will be applicable from the d<strong>at</strong>e of<br />

issue of work order after signing the agreement.<br />

The time allowed for commissioning of the plant by the contractor or his agent shall<br />

be deemed to be clearance of contract. In case of delay in commissioning of the plant on<br />

the part of the contractor, the purchaser shall be entitled to recover and the contractor shall<br />

be liable to pay liquid<strong>at</strong>ed damages <strong>at</strong> the r<strong>at</strong>e of 1½% of the total contract value for each<br />

and every month or part thereof for which commissioning is delayed. Provided always th<strong>at</strong><br />

the entire amount of liquid<strong>at</strong>ed damages to be paid under the provisions of this clause shall<br />

not exceed 6% of the total contract value.