OTHER TERMS AND CONDITIONS.<br />
SECTION : VI<br />
Page 30 of 34<br />
1. The work shall be carried out as per “Detail scope of work” and technical specific<strong>at</strong>ions<br />
as specified.<br />
2. If any staff /worker of the contractor is found indulging in undesirable activity the<br />
contract may be termin<strong>at</strong>ed.<br />
3. The cost of damage to the Railway property if incurred during the execution of work<br />
will be borne by the contractor.<br />
4. If any compens<strong>at</strong>ion / penalty is to be paid by the railway in compliance of the order /<br />
judgement passed by the court , consumer forum or any other law enforcing agency on<br />
default of the contractor or his person/servant/employee to the complainant , receive<br />
amount shall be liable to be paid by the contractor.<br />
5. Besides specific penalty as above tender accept authority result the right to impose<br />
penalty/penalties for non-compliance of any other conditions of the tender.<br />
6. In case of any contradiction between special term & condition and general conditions<br />
then the special terms & conditions shall prevail.<br />
7. Air, w<strong>at</strong>er & electricity shall be supplied free of cost if available <strong>at</strong> the <strong>site</strong>. In case of<br />
non-availability of the above <strong>at</strong> the <strong>site</strong> of work, the contractor shall arrange by his own<br />
resources.<br />
8. Except where specifically st<strong>at</strong>ed otherwise in the tender documents, the work is being<br />
carried out in accordance with N.E.Railway ‘General conditions of contract May-1999<br />
or l<strong>at</strong>est version.<br />
9. The contractor shall insured th<strong>at</strong> without prior written permission of the railway their<br />
employees shall not remain in the railway premises after the completion of their<br />
specified timings or on completion of their work under this contract.<br />
10. If any figure(s) d<strong>at</strong>a /dimensions differ from those mentions in the scope of work, the<br />
figure (s) d<strong>at</strong>a/dimension shown in the tender document shall be taken as correct.<br />
However, in case of doubt the contractor may refer the same to the “Engineer” whose<br />
decision will be final and binding.<br />
11. Facility to work Electricity, air, w<strong>at</strong>er, If required for the execution of work shall be<br />
provided free of cost to the contractor, if available <strong>at</strong> <strong>site</strong>.<br />
12. The contractor shall provide “Identity card “to all those deputed to work, who shall<br />
carry out the said works. Those employees having and wearing proper identity card,<br />
details of whom have been submitted to the concern SSE/G will only be allowed to<br />
work inside the complex.<br />
13. Firm has to be supply two mobile phone (Superior branded quality) for communic<strong>at</strong>ion<br />
purpose with firm.<br />
14. The contractor is responsible for using all safety measures by the employees during<br />
execution of the work. The contractor shall be liable all safety of these work may<br />
during the course of contact. It is made clear th<strong>at</strong> no claim/ compens<strong>at</strong>ions would be<br />
entertained for any type of accident / incident involving his labour. Any compens<strong>at</strong>ion<br />
however, as required under law would be payable the contractor.<br />
15. Addenda and corrigenda to the ‘special/ other terms and condition’ may be issued as &<br />
when necessary and the tender/s shall abide by them.