REM Rapport Annuel No. 1 OIF Congo Brazzaville - Forests Monitor
REM Rapport Annuel No. 1 OIF Congo Brazzaville - Forests Monitor
REM Rapport Annuel No. 1 OIF Congo Brazzaville - Forests Monitor
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Appendix 7: Summary of the Unfulfilled Obligations of the Logging Companies Visited by <strong>REM</strong> (source: <strong>REM</strong> reports, 1st half of 2008)<br />
Report <strong>No</strong>. FMU/FEU Company Location Observations in the Field<br />
01/<strong>OIF</strong>/<strong>REM</strong><br />
(from 25 to 30<br />
<strong>No</strong>vember<br />
2007)<br />
02/<strong>OIF</strong>/<strong>REM</strong><br />
(from 17 to 24<br />
February 2008)<br />
03/<strong>OIF</strong>/<strong>REM</strong><br />
(from 09 to 20<br />
March 2008)<br />
04/<strong>OIF</strong>/<strong>REM</strong><br />
(from 09 to 20<br />
March)<br />
ABALA FMU SOFIA PLATEAUX The logging camp and all its<br />
elements did not exist. Deemed<br />
too close to the sawmill, its<br />
installation, while started, was<br />
interrupted.<br />
MAMBILI FMU<br />
COTOVINDOU<br />
FEU<br />
MAMBILI<br />
WOOD<br />
CUVETTE<br />
WEST<br />
At Logging Camp In the Department At the MEF<br />
The logging camp and all its<br />
elements (school, infirmary,<br />
visitor’s hut, water supply<br />
system, and company store) did<br />
not exist.<br />
SICOFOR KOUILOU The logging camp exists but<br />
does not contain a school,<br />
company store, infirmary, water<br />
supply system, or visitor’s hut<br />
for MEF agents.<br />
NKOLA FEU FORALAC KOUILOU Everything was done except the<br />
potable water system.<br />
<strong>No</strong>ne of the obligations had been<br />
fulfilled.<br />
<strong>No</strong>ne of the obligations had been<br />
fulfilled.<br />
SICOFOR’s agreement did not provide<br />
for obligations because they had<br />
already been fulfilled by MAN FAI TAI,<br />
of which SICOFOR is a continuation.<br />
‐ Tchitondi‐Tchess road segment not<br />
maintained.<br />
‐ Lack of DGEF/logging company<br />
negotiation for the signature of a<br />
memorandum of understanding to<br />
support socio‐economic development<br />
<strong>No</strong>ne of the obligations had been<br />
fulfilled.<br />
<strong>No</strong>ne of the obligations had been<br />
fulfilled.<br />
SICOFOR’s agreement did not provide<br />
for obligations because they had<br />
already been fulfilled by MAN FAI TAI,<br />
of which SICOFOR is a continuation.<br />
Everything was done except the<br />
formation of the Nzambi brigade.<br />
05/<strong>OIF</strong>/<strong>REM</strong><br />
(from 20 to 31<br />
March 2008)<br />
06/<strong>OIF</strong>/<strong>REM</strong><br />
(from 20 to 31<br />
March)<br />
NANGA FEU CITB QUATOR KOUILOU The logging camp and all its<br />
elements (school, infirmary,<br />
visitor’s hut, water supply<br />
system, and company store) did<br />
not exist.<br />
BOUBISSI FEU<br />
NOUVELLE<br />
TRABEC<br />
KOUILOU<br />
Everything was done except the<br />
construction of a school.<br />
Everything was done.<br />
Tchissakata‐Tchitanzi road segment<br />
not renovated and maintained.<br />
‐ Magenga dispensary not renovated.<br />
‐ Primary schools of Malemba and<br />
Boubissi not repaired.<br />
‐ Computer and printer not delivered<br />
to the DGEF.<br />
‐ Wireless telegraph not delivered to<br />
the DGEF.<br />
‐ All‐terrain motorcycle not delivered<br />
to the DGEF.<br />
Everything was done.<br />
59