Belwind<br />
www.belwind.eu<br />
Contact<br />
Frank Coenen<br />
CEO<br />
T +32 50 78 11 63<br />
info@belwind.eu<br />
Kustlaan 176<br />
8380 Zeebrugge<br />
Keywords<br />
Offshore; wind; energy; green; renewable; wind turbine<br />
Products/services<br />
Belwind Phase 1<br />
■■<br />
55 turbines Vestas V90<br />
■■<br />
Power per turbine: 3 MW<br />
■■<br />
Power wind farm: 165 MW<br />
■■<br />
Expected yearly return: 550.000 MWh<br />
■■<br />
Avoided CO 2<br />
-emission: 270.000 ton<br />
■■<br />
Location: Bligh bank, 46 km offshore<br />
■■<br />
100 % Operational: December 2010<br />
■■<br />
Investment: 614 mln €<br />
Belwind Phase 2<br />
■■<br />
Power windfarm: 165 MW<br />
■■<br />
Expected yearly return: 550.000 MWh<br />
■■<br />
Avoided CO 2<br />
-emission: 270.000 ton<br />
■■<br />
Location: Bligh bank, 46 km offshore<br />
■■<br />
Expected investment: 650 mln €<br />
■■<br />
Planned: 2014 - 2015<br />
Some references<br />
Belwind Phase 1 - Bligh bank<br />
Company description<br />
Belwind nv is building a wind farm on <strong>the</strong> Bligh Bank, which will produce<br />
green energy over <strong>the</strong> next 20 years. The first phase has been operational<br />
since end of 2010, after building <strong>the</strong> second phase (2014-2015) 110 turbines<br />
will cover <strong>the</strong> energy consumption of 350,000 households.<br />
To reach <strong>the</strong> European ‘20-20-20’ standard and to secure energy supplies,<br />
Belgium is appealing on renewable energy.<br />
Partly thanks to Belwind our country can achieve <strong>the</strong>se strategic objectives.<br />
Wind<br />
20 www.renewableenergyclub.be