28.04.2014 Views

Drawings for Sewer and Water - City of London

Drawings for Sewer and Water - City of London

Drawings for Sewer and Water - City of London

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

P/L<br />

Varies 1<br />

- PLAN - -P/L<br />

NOTES:<br />

1. Outlet hole diameter = 400m.<br />

located as required.<br />

2. Adjustment urllts <strong>and</strong> components<br />

shall be installed as Der OPSD<br />

701.030 <strong>and</strong> <strong>City</strong> <strong>of</strong><br />

<strong>London</strong> St<strong>and</strong>ard Drawi ng SW-5 0<br />

3. Class <strong>of</strong> concrete 30 MPA<br />

at 28 days<br />

4. Refer to OPSD 400.02 <strong>for</strong><br />

CATCH BASIN, CAST IRON FRAME<br />

AND FLAT SQUARE GRATE<br />

5. All catchbasin maintenance hole leads<br />

<strong>and</strong> grates are to be located a minimum<br />

<strong>of</strong> 0.6m from the P/L.<br />

100m dia. drain tile<br />

used in permeable so<br />

19rm crushed stone bedding<br />

15Omm min. depth<br />

A. ALL DIMENSIONS ARE IN MILLIMETRES<br />

UNLESS OTHERWISE SHOWN.<br />

SECTION A-A<br />

CITY OF LONDON STANDARD DRAWING<br />

DWG<br />

DATE<br />

sw-4.0 2002 03 20<br />

APPROVED BY<br />

CITY ENGINEER<br />

g&

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!