Drawings for Sewer and Water - City of London
Drawings for Sewer and Water - City of London
Drawings for Sewer and Water - City of London
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Min 1.0m from edge <strong>of</strong> trench<br />
Level ground /undisturbed surface<br />
or if disturbed, to be compacted to 100%<br />
S.P.M.D.D. <strong>and</strong> soil bearing capacity<br />
to be measured<br />
=l<br />
Unshrinkable fill, minimum<br />
0.6m below existing pipe<br />
up to centreline. Depth <strong>of</strong><br />
unshrinkable fillto be<br />
determined based on<br />
size <strong>of</strong> existing wm,<br />
Trenching to comply<br />
with M.O.L. guidelines,<br />
Existing ground<br />
Existing <strong>Water</strong>main<br />
Cut into side slopes<br />
0.6m in order to place<br />
unshrinkable fill<br />
Granular bedding<br />
to be installed to<br />
<strong>City</strong> <strong>of</strong> <strong>London</strong> St<strong>and</strong>ards.<br />
Proposed pipe to<br />
cross existing wm.<br />
label elevation <strong>of</strong><br />
pipe invert.<br />
WPICAL REINSTATEMENT /BEDDING DETAIL CROSS SECTION<br />
SEE DRAWING W-CS-69,_<br />
SHEET 3 FOR REQUIREMENTS<br />
Verify &<br />
lableldepth<br />
The watermain shall be protected by the following:<br />
- When crossing under or over the watermain there must be a<br />
minimum separation <strong>of</strong> at least 0.6m between the outside<br />
diameters <strong>of</strong> the crossing pipes.<br />
- A minimum 5.0m length <strong>of</strong> pipe shall be centered at the point<br />
<strong>of</strong> crossing so that the watermain joints will be equidistance<br />
<strong>and</strong> as far as possible from the sewer or PDC. Crossing must<br />
be absolute minimum 2.0m from watermain joint.<br />
- All construction methods including excavation <strong>and</strong> backfill<br />
compaction within 0.6m <strong>of</strong> existing watermain shall be done by<br />
h<strong>and</strong>.<br />
It should be noted that the support structure is to remain in<br />
place until the watermain is fully supported by the reinstated<br />
bedding (i.e, until SMPa unshrinkable fill is cured, provide bond<br />
break).<br />
CITY OF LONDON STANDARD DRAWING<br />
TYPICAL REINSTATEMENT /BEDDING DETAIL<br />
FOR 450mm AND UP WATERMAIN SUPPORT