28.04.2014 Views

Drawings for Sewer and Water - City of London

Drawings for Sewer and Water - City of London

Drawings for Sewer and Water - City of London

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SOUARE FORMED CONCRETE COLLAR<br />

Ex+end ouf 300nm olong existing sewer<br />

oncl 225nm oround borrel orch open¡ng<br />

o-SeeN<strong>of</strong>es4&8<br />

DOG HOUSE<br />

MA I NTENANCE<br />

HOLE<br />

STRUCTURE<br />

BARREL<br />

A<br />

FLOVJ<br />

l-.' I<br />

EXISTING<br />

SEWER<br />

'DOG HOUSE" MAINTENANCE<br />

:{l<br />

I<br />

I<br />

I<br />

I<br />

I<br />

Þ¡<br />

I<br />

I<br />

I A<br />

t..<br />

t-<br />

l-i Þ'"<br />

iË'<br />

l"i<br />

,lt<br />

BASE<br />

lp'<br />

,¡L<br />

CONCRE TE<br />

COLLAR c0L<br />

HOLE PROFILE<br />

1 200rm MIN<br />

FLOW-><br />

FLOW<br />

CHANNEL<br />

Exìsting sewer Íust be<br />

cut <strong>of</strong> the sÞring-l ine<br />

ocross ful I înternol<br />

w¡drh or structure<br />

B<br />

SECTION 'A_A'<br />

CONCRETE<br />

COLLAR<br />

FLOW+<br />

REINFORC¡NG<br />

AS SPEC IF IED<br />

I 50Ím<br />

MI<br />

REMOVE TOP HALF OF EX. PIPE AFTER<br />

MAINTENANCE HOLE IS CONSTRUCTED<br />

OR FORM NEAT CI{ANNEL AS SPECIFIED<br />

SIZE OF OPENING TO FIT<br />

EXISTING SEYIER PLUS 75nm<br />

z<br />

=<br />

19rm CRUSHED STONE<br />

BEDDING. MIN 150rm<br />

POURED IN PLACE CONCRETE BASE<br />

PRECAST CONCRETE BASE<br />

SECTION 'B-B'<br />

NoTES<br />

ùtrt/ I ll.Jl\ tt-t<br />

'l . The doghouse rnoinlenonce hole Íìoy only be usecl <strong>for</strong> plocing o new rnointenonce hole on on exísf ing<br />

soni<strong>for</strong>y or storm line when instollotion <strong>of</strong> o s+ondord rno¡ntenonce hole is not Þroc+icol.<br />

2. All mo¡ntenonce hole coñponents ore +o rnee+ oPSD 70'l .<br />

3. Al I benching ¡s fo meet 0PSD 701.21.<br />

4. Al I poured ¡n ploce concrefe to be 30 MPo.<br />

5. Concre+e bond¡ng ogen+ mrs+ be opÞlied +o oll in+erfoces <strong>of</strong> precost to cost-¡n-Þloce concrete.<br />

6. Full +¡me inspec+ion sholl be provided by +he consul+ing eng¡neer during insfollo+ion <strong>of</strong><br />

this s+ruc+ure ond +he consultonf sholl provicle written cer+ifÌc<strong>of</strong>ion <strong>of</strong> ¡ns+ollot¡on to the<br />

<strong>City</strong> <strong>of</strong> <strong>London</strong>. The strucfure rrust no+ be bockf ¡lled <strong>for</strong> minirnrm 24 hr <strong>of</strong>ter consfruc+ion to<br />

ol low <strong>for</strong> secondory inspec+¡on os required<br />

7. The top <strong>of</strong> +he existing nrcinline sewer rrusf be fully removed from springline ocross<br />

the ful I ïn+ernol wï

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!